Positioning/Set-Up of an arm on roof posts (heavy reinforcements/multiple metal thickness)
1.
Follow any of the instructions previously mentioned in the precautions and instructions
section.
2.
Position heaters parallel to the surface, the length of the heater along the length of the
roof post. Do not put the heater 90° to the post, unless the repair area is very small.
The
heater should be about 8" from the surface for the heavy reinforcement in the
posts.
3.
Aim the positioning beam on spot being repaired; make sure that the beam is not
aimed
at heat sensitive materials. The post is very narrow, so carefully position the
heat
sensor
w
here it will "see" the post.
4.
Engage caster lock.
5.
Recheck heat sensor aim with the positioning beam.
6.
Set the temperature and time settings.
7.
Start heat cycle.
8.
Approximately 3-5 minutes after start, check that the temperature is at set point and the
timer has started.
9.
When the timer and the heater lamps shut off, the cycle is complete and ready for the
next repair.
10. Press the E-stop button on unit when cycle has completed before moving unit to next
repair or in to storage position.
Positioning/Set-Up of an arm on rocker panels (heavy reinforcements/multiple metal thickness)
1.
Follow any of the instructions previously mentioned in the precautions and instructions
section.
2.
Position heaters parallel to the surface, the length of the heater along the length of the
rocker panel. If there is an auxiliary heater head, use both heaters and bend them at
about a 135° angle to focus more direct heat around the curve of the rocker panel. The
heater should be spaced about 8" from the surface for the heavy reinforcement in the
rocker panel.
3.
Aim the positioning beam on spot being repaired; make sure that the beam is not aimed at
heat sensitive materials
4.
Engage caster lock.
5.
Recheck heat sensor aim with the positioning beam.
6.
Set the temperature and time settings.
7.
Start heat cycle.
8.
Approximately 3-5 minutes after start, check that the temperature is at set point and the
timer has started.
9.
When the timer and the heater lamps shut off, the cycle is complete and ready for the next
repair.
10.
Press the E-stop button on unit when cycle has completed before moving unit to next
repair or in to storage position.
Summary of Contents for BGK AutoCure 6000-2216
Page 1: ...AutoCure 6000 2216 Overhead Heater Assembly and Operating Manual ...
Page 22: ......
Page 23: ......
Page 37: ......
Page 38: ......
Page 41: ...A DETAIL J SCALE0 40 1 REMOVET1 11SBOLTAFTERINSTAI I ATION ...
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ...AUTOCURE MODEL NUMBER AC6 2216 480 SP ...
Page 48: ......
Page 49: ......