22
EN
“UEX-PLUS” +030220621 - rel. 1.4 - 04.08.2009
installer
user
ser
vice
6. STARTING AND USER INTERFACE
Before starting the humidifi er, check:
water connections: Fig. 2.a page 10. In the event of water leaks do not
start the humidifi er before having resolved the problem;
steam distribution: Fig. 3.d page
13;
electrical connections chap. 4
6.1 Starting
1
1
0
ON
2
if the cylinder is new, run a pre-wash cycle (the cylinder is fi lled and
emptied three times, cleaning the inside walls from impurities, see
menu maintanance >change cylinder > fl ush new cylinder).
6.2 Stopping
1
empty the water in the cylinder to avoid stagnation: see manual
drain on “SET” screens).
2
1
0
OFF
6.3 First start-up (setting the language)
Select language:
1. English
2. Italiano
3. Deutsch
4. Francais
5. Espaniol
Press UP to select the number corresponding to the desired language and
then ENTER to confi rm. This screen remains displayed for 60 seconds.
Subsequently, the following screen will be displayed:
Show language mask to unit start-up...
Yes/no
YES: the screen for choosing choose the language will be displayed
•
when the humidifi er is started the next time;
NO: the screen for choosing choose the language will no longer be
•
displayed on power-up.
Note The language can also be changed from the maintenece
menu.
6.4 Keypad
6
4
5
3
2
1
Fig. 6.a
button
function
(1) alarm
list active alarms and reset any alarms
(2) PRG
return to the “main” screen
from the “Main” screen access the main menu
(3) ESC
return to the previous screen/display
(4) UP
circular navigation inside the menus, the screens, the
parameters and the values of the parameters
from the “main” screen access an “INFO ” screens
(5) ENTER
select and confi rm (like the “Enter” key on a computer
keyboard)
from the “SET” main menu
(6) DOWN
circular navigation inside the menus, the screens, the
parameters and the values of the parameters
from the “main” screen access an “INFO” screens
6.5 “Main” screen
1
2
3
5
4
6
7
Fig. 6.c
symbol
function
(1)
description of the activity in progress(*)
(2)
value read according to the type of signal connected
(3)
status of steam production(**):
in progress (as per the fi gure)
alarm
disabled
no request
(4)
time bands set
(5)
access to the “INFO” screen (UP or DOWN button)
(6)
access to the “SET” screen (ENTER button)
(*) Type of descriptions:
OPERATING
•
: steam production in progress,
BLOCKING ALARM
•
: steam production disabled by alarm,
OFF BY SUPERVISOR
•
: steam production disabled by supervisor,
OFF BY SHEDULER
•
: steam production disabled during a pre-set
sheduler,
OFF BY REMOTE
•
: steam production interrupted through the opening
of the “Remote ON/OFF” contact.
OFF BY KEYBOARD
•
: steam production disabled by keyboard (see
“SET” mask),
NO REQUEST
•
: humidifer on, without steam production request.
(**) In the models with two cylinders, the symbols for the operating status
of both cylinders are displayed.
6.6 “INFO” screens (read-only)
Series of read-only screens for displaying the main humidifi er status
values. To access, press UP or DOWN from the “Main” screen. There are 3
“INFO” screens (4 if the humidifi er has two cylinders); to move from one
screen to the next, press UP or DOWN.
Press ESC to return to the “Main” screen.
“INFO” screens:
Info
display
UOM
Status
(*)
Steam production
value
kg/h
Current
value
A
Dehumidifier
ON/OFF
Alarm relay
ON/OFF
Conductivity
value
μS/cm
(*) humidifer status:
Operating:
•
steam production in progress;
Alarms
•
: signalling of one or more alarms;
OFF by Superv
•
.: steam production disabled by supervisor;
OFF by Sched.:
•
steam production disabled during a pre-set
sheduler;
Summary of Contents for humiSteam x-plus
Page 1: ...humiSteam x plus User manual humidifiers ...
Page 2: ......
Page 4: ......
Page 6: ......
Page 56: ...Note ...
Page 57: ...Note ...
Page 58: ...Note ...
Page 59: ......