Preparing The Finisher for
Installation
1.
TP ; M3
㹶
6
2x
A
B
C
NOTE:
Install the Ground rail to the position [B].
2.
When the Service Book Holder has already been
installed in the Host Machine, relocate it to the
Finisher.
Connecting to Host Machine
1.
CAUTION:
When connecting the Interface Cable, be sure to turn
off the Host Machine and disconnect its power cable
from the outlet.
1x
2.
NOTE:
If the positioning pin of the Buffer Pass Unit is not fitted the
positioning hole on the Finisher, carry out the adjustment
described in "Adjusting the Height".
7. Installation
205
Summary of Contents for Staple Finisher-AA1
Page 1: ...Revision 4 0 Staple Finisher AA1 Booklet Finisher AA1 Service Manual ...
Page 12: ...Product Overview 1 Features 5 Specifications 6 Names of Parts 14 Optional Configuration 20 ...
Page 83: ...Periodical Service 3 Periodic Servicing Tasks 76 ...
Page 87: ...3 Remove the 2 Connectors 1 2x 1 4 Parts Replacement and Cleaning 79 ...
Page 89: ...Main Units Parts 4 5 6 7 8 1 2 3 4 Parts Replacement and Cleaning 81 ...
Page 128: ...4x 1 2 2 3 3 2x 4 Parts Replacement and Cleaning 120 ...
Page 150: ...Adjustment 5 Overview 143 Basic Adjustment 148 Adjustments When Replacing Parts 173 Other 184 ...
Page 193: ...Troubleshooting 6 Making Initial Checks 186 Processing Tray Area 187 Saddle Stitcher Area 188 ...
Page 204: ...4 5 6 7 8 9 7 Installation 196 ...
Page 205: ...10 7 Installation 197 ...
Page 223: ...2 3 2x 7 Installation 215 ...
Page 224: ...APPENDICES Service Tools 217 General Circuit Diagram 218 ...