[1]
[2]
[2]
2x
20. Remove the spring of the roller tensioner(rear) [1].
[1]
21. Remove the bearing.
• 2 bearing [1]
[1]
22. Remove the E-ring[1] and shaft support [2]
[1]
[2]
23. Remove the spring of the roller tensioner(front) [1].
[1]
24. Remove the bearing.
• 2 C-ring [2]
• 2 bearing [1]
[2]
[1]
25. Loosen fixed screw of stitcher unit.
• 4 screws
CAUTION:
When loosening the Fixation Screw, be sure to check
the Fixation Position(scale).
4. Parts Replacement and Cleaning
140
Summary of Contents for Staple Finisher-AA1
Page 1: ...Revision 4 0 Staple Finisher AA1 Booklet Finisher AA1 Service Manual ...
Page 12: ...Product Overview 1 Features 5 Specifications 6 Names of Parts 14 Optional Configuration 20 ...
Page 83: ...Periodical Service 3 Periodic Servicing Tasks 76 ...
Page 87: ...3 Remove the 2 Connectors 1 2x 1 4 Parts Replacement and Cleaning 79 ...
Page 89: ...Main Units Parts 4 5 6 7 8 1 2 3 4 Parts Replacement and Cleaning 81 ...
Page 128: ...4x 1 2 2 3 3 2x 4 Parts Replacement and Cleaning 120 ...
Page 150: ...Adjustment 5 Overview 143 Basic Adjustment 148 Adjustments When Replacing Parts 173 Other 184 ...
Page 193: ...Troubleshooting 6 Making Initial Checks 186 Processing Tray Area 187 Saddle Stitcher Area 188 ...
Page 204: ...4 5 6 7 8 9 7 Installation 196 ...
Page 205: ...10 7 Installation 197 ...
Page 223: ...2 3 2x 7 Installation 215 ...
Page 224: ...APPENDICES Service Tools 217 General Circuit Diagram 218 ...