6
6
6-7
6-7
Installation > Unpacking > Unpacking Procedure
Installation > Unpacking > Unpacking Procedure
3) Remove the cushioning material (Styrofoam) and the pallet from the upper cover.
1
2
4) Slightly lift the front and rear casters, and remove the cushioning material (Styrofoam).
F-6-8
F-6-9
5) Take the finisher out of the bag and remove the tape used outside the finisher.
6) Remove the cushioning material (Styrofoam) of the upper tray and the lower tray.
7) Remove the fixing screw, and remove the metal fittings fixing.
• 2 screws
x2
F-6-10
F-6-11
Summary of Contents for J1
Page 4: ...Blank Page ...
Page 8: ...Safety Precautions Notes Before it Works Serving Points to Note at Cleaning ...
Page 58: ...3 3 Periodic Servicing Periodic Servicing List of Work for Scheduled Servicing ...
Page 99: ...5 5 Adjustment Adjustment Outline Basic Adjustment Adjustment at Time of Parts Replacement ...
Page 133: ...Appendix Service Tools General Circuit Diagram ...