4
4
4-33
4-33
Parts Replacement and Cleaning Procedure > Consumable Parts and Cleaning Points > Removing the Swing Unit Static Charge Eliminator
Parts Replacement and Cleaning Procedure > Consumable Parts and Cleaning Points > Removing the Swing Unit Static Charge Eliminator
10) Remove two clips [1] of the return roller axis.
11) Pull out the return roller axis and remove two return rollers [2] together with collar.
12) Separate the return roller and collar.
F-4-67
Removing the Swing Unit Static Charge Eliminator
NOTE:
When replacing the consumable parts, be sure to clear the parts counter.
(COPIER > COUNTER > DRBL-2 > FSWG-STC)
(COPIER > COUNTER > DRBL-2 > DL-STC)
1) Remove the front cover.
2) Remove the rear cover.
3) Remove the front inside upper cover. (In the case of Staple Finisher, this procedure is
unnecessary.)
4) Remove the left upper cover.
5) Remove the grate-shaped upper guide.
8) Remove the grate-shaped lower guide.
9) Remove the stapler.
10) Remove the processing tray.
11) Remove the screw [1] securing the static charge eliminator at the center of the swing
unit.
12) Remove two screws [2] securing the ground of the delivery side static charge eliminator.
F-4-68
Summary of Contents for J1
Page 4: ...Blank Page ...
Page 8: ...Safety Precautions Notes Before it Works Serving Points to Note at Cleaning ...
Page 58: ...3 3 Periodic Servicing Periodic Servicing List of Work for Scheduled Servicing ...
Page 99: ...5 5 Adjustment Adjustment Outline Basic Adjustment Adjustment at Time of Parts Replacement ...
Page 133: ...Appendix Service Tools General Circuit Diagram ...