background image

 

 

CAMPO EQUIPMENT CO. LTD. (ECOBLAZE) 

6 Carson Court, Brampton, ON, CANADA, L6T 4P8 

Tel: (905) 793-2525 | Fax: (905) 793-8768 

www.campoequipment.com

  

pg. 19

 

C82056 

1 1/2" RTC ball valve 

C82040 

Contactor 

C82041 

Transformer 

C82042 

RELAY 240A 

C50242 

Aux. Contact N.O. 50A 

 

Summary of Contents for ECOBlaze DF1600

Page 1: ...t com pg 1 NG LP DIRECT FIRED SPACE HEATER BLAZE DF1600 WWW CAMPOEQUIPMENT COM REPORT 0367GH009S Installation Instructions Manual Maintenance Parts List CAUTION DO NOT TAMPER WITH HEATER OR ITS CONTROLS CALL A QUALIFIED SERVICE TECHNICIAN Retain manual for future reference May 19 2021 CERTIFIED FOR USE IN CANADA AND THE U S A ...

Page 2: ...s remain with the heater GENERAL HAZARD WARNING FAILURE TO COMPLY WITH THE PRE CAUTIONS AND INSTRUCTIONS PROVIDED WITH THIS HEATER CAN RESULT IN DEATH SERIOUS BODILY INJURY AND PROPERTY LOSS OR DAMAGE FROM HAZARDS OF FIRE EXPLOSION BURN ASPHYXIATION CARBON MONOXIDE POISONING AND OR ELECTRICAL SHOCK ONLY PERSONS WHO CAN UNDERSTAND AND FOLLOW THE INSTRUCTIONS SHOULD USE OR SERVICE THIS HEATER IF YOU...

Page 3: ...nsferable to any subsequent owner The warranty period is one year from the date of purchase The warranty covers all defects in material and workmanship insofar as they are of Campo Equipment CO LTD manufacture This warranty is limited to the furnishing of new parts only in the event the original part is determined to be defective by Campo Equipment CO LTD The warranty does not include transportati...

Page 4: ...erature is well below the material flash point Under no circumstance should any combustible material be stored in the airstream within 15 feet 4 57 m of the air discharge port or within 6 15 2cm of the top sides or ends of the heater WARNING This heater must be placed at least 10 Ft 3 05M from any LP Gas Container The discharge air stream of this heater must not be directed toward any LP Gas conta...

Page 5: ...hten any connection as necessary The supply gas hose being used must be protected from traffic building materials and contact with hot surfaces both during usage and while in storage The supply gas hose shall be visually inspected prior to each use of the heater If it is evident there is excessive abrasion or wear or the hose is cut it must be replaced prior to the heater being put into operation ...

Page 6: ...power supply compartment there are four CAM locks and a 3 Phase 250V 30 Amp male plug use either one of them When using the plug make sure that the CAM locks have caps on them The main power switch should be in the OFF positions This power source must include a Short Circuit protection device such as a circuit breaker or fusible With all connections secure including grounds energize the heater Pla...

Page 7: ...RNING A qualified electrician must make the adjustments 4 Check to be sure the air proving switch sensor tubes are clear of any obstructions NOTE Listen to hear the pilot solenoid valve click If the click is not heard the solenoid valve may not be opening and may be defective Sparking should also be present at the spark igniter in the burner If the click is heard and pressure is registered move th...

Page 8: ...g and gas codes When storing the heater indoors the gas connection between the heater and the supply cylinder must be disconnected Preparing After Extended Storage Several days or weeks before the heater will be used attention should be paid to properly preparing the heater for service Since the heater is an important element of your operation it only makes sense that a certain amount of time is n...

Page 9: ...Minimum flame results from zero volts DC The DF1600 heater has a minimum BTU input rating of 324538 BTUs on NG 81782 Kcal and 326289 BTUs 82223 Kcal on LP The Belimo Modulating System has been pre set at the factory to insure this input No field adjustment of this set point is required Conventional Remote Thermostat The optional remote thermostat if used connects to the remote thermostat receptacl...

Page 10: ...tory and should be changed by authorized service personnel only Igniter To start ignition the igniter must be adjusted properly and must not be damaged or defective Periodically the igniter should be inspected for damage corrosion and separation To inspect and adjust the igniter use the following procedure 1 Remove the igniter from the burner 2 Visually inspect the igniter for corrosion and damage...

Page 11: ...od Remember that the blower must be operating properly for the burner to operate The switch can be tested using an ohmmeter To test use the following procedure 1 Disconnect the main power supply open the Electrical Compartment 2 Set the ohmmeter in the continuity test mode 3 With the main switch in OFF position place one tester lead on the common contact and one tester lead on the contact relative...

Page 12: ... continuity light to the switch N O contacts Place the Heat Fan switch to FAN position The ohmmeter should read low resistance or the continuity light should come on When the blower is stopped the light should go out and the resistance reading should be high If the contacts remain closed regardless of the blower status the air switch must be replaced Contact the factory in the event the switch mus...

Page 13: ...there is power to the VFD Burner does not ignite 1 Voltage insufficient 1 Check incoming supply 2 Electrode disconnected adjusted incorrectly defective 2 Connect adjust replace electrode 3 Air Proving Sw Disconnected defective 3 Connect Replace Air Proving Sw 4 Tilt switch Disconnected or Unit is not on a level surface or defective 4 Connect Replace Tilt Switch or Level the Unit 5 Fan Over heat sw...

Page 14: ...ng Sw 5 Flame rod dirty defective 5 Clean Replace Flame Rod 6 Inadequate fuel delivery 6 Fill Tank replace regulators valves check gas lines for obstructions TROUBLESHOOTING DF1600 DIRECT FIRED HEATER PROBLEM CONDITION REMEDY Heater overheating 1 Gas pressure excessive 1 Adjust replace regulator 2 RTC Discharge Temperature Sensor defective 2 Replace sensor troubleshoot modulation system ...

Page 15: ...CAMPO EQUIPMENT CO LTD ECOBLAZE 6 Carson Court Brampton ON CANADA L6T 4P8 Tel 905 793 2525 Fax 905 793 8768 www campoequipment com pg 15 WIRING DIAGRAM ...

Page 16: ...oltmeter C70064 3 POSITION SWITCH C70069 FIXING COLLAR C70067 N O CONTACT BLOCK C70028 VFD C70137 R Fan 500 C90025 Power On Indicator Light GREEN C90029 Outlet for Plug C70052 TILT SWITCH C82036 Spark Controller C80186 MAIN CONTROLLER C82163 Actuator ball valve 11 2 NPT C80916 12 Discharge Air tube C60139 Temperature Sensor c w Stew C82164 Bracket Assy Kit 1 2 C82165 MODULATING ACTUATOR C60136 1 4...

Page 17: ...5 Street Elbow C80123 1 5 Union C82050 1 1 2 x 1 1 2 x 3 4 T section C82051 3 4 to 1 4 reducer C60143 1 1 2 X 1 4 Nipple C82052 1 4 elbow C80913 1 4 NPT x 1 4 90 component male elbow C82053 1 1 2 MAIN VALVE C82054 Maxitrol Pressure Regulator C82055 1 1 2 ASCO Solenoid Valve C60137 1 4 Maxitrol pressure regulator C60129 57 5 Copper Tubing C50251 High Pressure Switch C70041 RELAY C70042 RELAY BASE C...

Page 18: ...BRACKET C82084 SUPPLY PANEL RECTANGULAR ASSY C82087 Serial Number variable data C82088 Warning Use with Propane or Natural Gas Only C82090 Caution supply cord C82091 Caution door panel closed C82092 caution adequate ventilation C82093 General Hazard Warning C82094 Warning Max Inlet Pressure C82095 Position Heater Properly before use C82096 Wiring Diagram C82097 DF 1600 logo C82098 Decal Campo Logo...

Page 19: ... ECOBLAZE 6 Carson Court Brampton ON CANADA L6T 4P8 Tel 905 793 2525 Fax 905 793 8768 www campoequipment com pg 19 C82056 1 1 2 RTC ball valve C82040 Contactor C82041 Transformer C82042 RELAY 240A C50242 Aux Contact N O 50A ...

Reviews: