6. Check Flame Rod to be sure it is clean.
(See Maintenance section of this
Manual.)
7. Check that the gas type and inlet pressures
agree with that stated on the DF1600
Identification Plate. This plate may indicate
both Natural Gas and LP.
8. Check all unions and valves for tightness
and proper operation. Tighten or replace
as necessary. Use Sherlock 5-second leak
(of proper temperature) or soapy water on
all NEW connections to be sure they are
tight.
9. Service and make all adjustments before
starting heater.
10. All area surrounding the heater must be
kept clear and free from combustible
materials, gasoline and other flammable
vapors and liquids.
Starting Heater
NOTE:
Do all items in the PRE-START
CHECKLIST before starting the heater.
ATTENTION:
Gas and electrical connections
must conform to all local area codes.
1. Check Heater Identification Plate and decals
for correct supply voltage and phase.
WARNING
Only a qualified electrician shall connect or
disconnect all electrical power cords.
CAUTION:
Power supply cord must be
adequate for total unit power requirements and
distance to primary power source.
2. This appliance receives 1 Phase or 3 Phase
208 to 240 V supply must be available.
INSTALLATION:
Single Phase
Three Phase
Up to 100’ 3 # 6
Up to 100’ 4 # 8
Up to 200’ 3 # 4
Up to 200’ 4 # 6
Up to 300’ 3 # 3
Up to 300’ 4 # 4
NOTE:
To power up the heater inside the
power supply compartment there are four CAM
locks and a 3 Phase, 250V, 30 Amp male plug,
use either one of them. When using the plug
make sure that the CAM locks have caps on
them. The main power switch should be in the
“OFF” positions. This power source must
include a “Short Circuit” protection device such
as a circuit breaker or fusible.
With all connections secure, including grounds,
energize the heater. Place the main power
switch to on position that should illuminate the
green neon light and should energize the RTC
DFC+ Controller.
WARNING
Only qualified gas fitting personnel shall
connect or disconnect fuel supply lines to
supply tanks and or gas mains and the
heater gas inlet manifold.
Note: Do not attempt to manually light the
pilot.
1. Connect fuel supply line to manifold inlet.
Turn on the gas supply at source and check
for leaks at all connections.
2. Open all valves between fuel supply and
gas manifold inlet valve, and then open gas
manifold inlet valve.
3. Place the heat/Fan switch to
“HEAT”
position if running without thermostat and if
running with the thermostat leaving the
heat/Fan
switch to ‘HEAT’ position plug in
the thermostat in to the remote stat
receptacle. Then blower will start and purge
the unit for a pre-set time (2-5 sec.) before
the ignition sequence will begin.
4. Once the pilot flame has been established,
the main flame will come on and will begin
to adjust as needed to maintain the
discharge air temperature at the pre-set
temperature.
NOTE:
Air may be trapped in the gas supply
line and the gas manifold. A second or third
trial for ignition may be necessary to purge all
the air from the system. If a flame is not
established during the first trial for ignition.