CS616 and CS625 Water Content Reflectometers
2: If time is (P92)
1: 0000
Minutes (Seconds --) into a
2: 240
Interval (same units as above)
3: 30
Then
Do
3: Temp (107) (P11)
;Measure soil temperature.
1: 1
Reps
2: 1
SE
Channel
3: 1
Excite
all
reps
w/E1
4: 1
Loc [ TSoil ]
5: 1.0
Mult
6: 0.0
Offset
4: CS616 Water Content Reflectometer (P138)
1: 1
Reps
2: 2
SE
Channel
3: 4
C4 is first of sequential Control Ports used
4: 3
Loc [ CS616 ]
5: 1.0
Mult
6: 0.0
Offset
;The following four instructions correct CS616 period for soil temperature
;The corrected period is stored as variable NewCS616.
5: Polynomial (P55)
1: 1
Reps
2: 3
X Loc [ CS616 ]
3: 4
F(X) Loc [ TempCS616 ]
4: 0.526
C0
5:
-0.052 C1
6: 0.00136 C2
7: 0.0
C3
8: 0.0
C4
9: 0.0
C5
6: Z=X-Y (P35)
1: 2
X Loc [ Tref ]
2: 1
Y Loc [ TSoil ]
3: 5
Z Loc [ TFactor ]
7: Z=X*Y (P36)
1: 5
X Loc [ TFactor ]
2: 4
Y Loc [ TempCS616 ]
3: 4
Z Loc [ TempCS616 ]
8: Z=X+Y (P33)
1: 3
X Loc [ CS616 ]
2: 4
Y Loc [ TempCS616 ]
3: 6
Z Loc [ NewCS616 ]
9: Polynomial (P55)
;Convert corrected probe period to water content.
1: 1
Reps
2: 6
X Loc [ NewCS616 ]
3: 7
F(X) Loc [ WaterCont ]
4: -0.0663 C0
5: -0.0063 C1
6: 0.0007 C2
22
Summary of Contents for CS616
Page 2: ......
Page 8: ...Table of Contents iv ...
Page 50: ...CS616 and CS625 Water Content Reflectometers 42 ...
Page 52: ...Appendix A Discussion of Soil Water Content A 2 ...
Page 53: ......