8.Needed tools
19
8. Needed tools
The following tools are needed for the installation of the heater:
7 mm wrench – Fuel connections and duct clamps
10 mm wrench – Heater mounting
13 mm wrench – Exhaust clamp
In case you need to install lines through bulkheads the following drill heads
may be needed:
6 mm - Fuel lines
25 mm - Fuel tank diver
30 mm - Air intake line
35 mm - Exhaust line
60/90 mm - Air duct (2 and 4 kW respectively)
Summary of Contents for Calaer 2 kW
Page 1: ...Installation manual 2kW Calaer air heater 4kW Calaer air heater...
Page 2: ......
Page 4: ...2...
Page 8: ...6...
Page 12: ...10...
Page 14: ...12...
Page 16: ...6Heaterdimensions 14 Calaer 4 kW heater All measurements are given in millimeter mm...
Page 17: ...6 Heaterdimensions 15...
Page 18: ...16...
Page 20: ...18...
Page 22: ...20...
Page 28: ...26...
Page 38: ...36...
Page 44: ...42...
Page 58: ......