Before the Gate Operator Installation
Gate Structure
Con
fi
rm that the gate operator being installed is appropriate for the gate type, weight
and size. The gate should be mounted and moving freely. There should be little
resistance in the movement of the gate. The gate and post must be suitable for being
automated. Check that the structure is sufficiently strong and stable, and that its
dimensions and weights conform to those listed in the specifications table of this
document. Any worn or damaged gate hardware must be repaired or replaced before
installing the gate operator.
Secure outdoor or easily accessed gate operator controls in order to prohibit
unauthorized use of the gate.
Vehicular gates should be constructed and installed in accordance with the ASTM F2200
construction standards.
Electricity
The CM
6
is powered by 110V-120V AC power. If you have not already done so, and you
are not using solar, wire a waterproof outlet near the gate following proper safety
standards for your area. If you are not experienced with this type of wiring or if your
area requires it, hire a professional electrician to perform this as well as wire in the CM
6
gate operator. Make sure your electrician takes into account the voltage drop involved
in running many feet of wire to your installation location. If an insufficient gauge of wire
is used, the gate operator may have insufficient power.
The gate operator must be disconnected from the power source before the installation.
This also includes gate operator accessories.