7-2
Frame Relay Module 4. 0 User G uide, Rev 01
Frame Relay Backup
Frame relay virtual-circuit backup in the FRM provides frame relay DLCIs with auto-
matic backup protection in the event of LMI loss or port failure. (A DLCI is con-
sidered down/inactive if level 1 is down. If LMI is used, the DLCI is also considered
inactive if not reported as active in a Full Status Message from the DCE.)
A physical frame relay port can be dedicated to providing backup DLCIs, or backups
can co-exist with "regular" DLCIs on a port.
In a backup configuration, one end is considered the "initiating" node and the other the
"remote" node. The initiating end is the one that will establish the backup link if it dis-
covers that the primary link is down. (A node can be the initiating node for some
backup configurations and the remote node for others.)
Any sessions in progress when a primary DLCI goes down will not be
transferred directly to the backup DLCI, but will be reset, then established
on the backup.
DLCIs used for backup on the initiating node are assigned to "backup groups," each
of which can contain up to ten backup DLCIs. A backup group is then assigned to one
or more "primary" DLCIs (the ones that will be backed up).
The basic procedure for configuring backup DLCIs is:
1. Configure all DLCIs that will be backed up or used as backups. All parameters
can be configured for each DLCI except specifying a
Backup Group Number
on a
primary DLCI (that will be backed up) on an "initiating" node (which will initiate
the switchover to a backup DLCI).
2. Configure backup groups. A backup group is one or more DLCIs that will act as
backup if the primary goes down.
3. Configure
Backup Group Number
s and related information for primary DLCIs.
This will assign a Backup Group to each primary DLCI.
For each example in
Figure 7-1
, assume that Node 1 is a remote site and Node 2 is a
central site. Also assume that Node 1 will be the initiating node. On that node, the
primary DLCI is on port 2 and the backup is on port 0.
Summary of Contents for FRM
Page 4: ...iv Frame Relay Module 4 0 User Guide Rev 01 ...
Page 16: ......
Page 17: ...Section I Getting Started ...
Page 18: ......
Page 24: ......
Page 35: ...Section II Configuration ...
Page 36: ......
Page 58: ......
Page 123: ...Configuring X 25 8 35 ...
Page 124: ......
Page 168: ......
Page 198: ......
Page 248: ......
Page 254: ......
Page 255: ...Section III Operation ...
Page 256: ......
Page 272: ......
Page 300: ......
Page 350: ......
Page 351: ...Section IV Appendices ...
Page 352: ......
Page 358: ......
Page 364: ......
Page 370: ......
Page 374: ......
Page 378: ...C View Initialization Report D View Previous Initialization Report ...
Page 388: ......
Page 396: ......