![BWT COVERDECK Installation And Operating Instructions Manual Download Page 35](http://html1.mh-extra.com/html/bwt/coverdeck/coverdeck_installation-and-operating-instructions-manual_2836664035.webp)
A: Filling stop level with respect to the
deck level
Coping M30
135 mm
Coping M40
125 mm
Coping M55
110 mm
B: Filling start level with respect to the
deck level
Coping M30
115 mm
Coping M40
105 mm
Coping M55
90 mm
A
B
40
21
The water level A is between 110 and 135 mm from the top of the body with respect to the height of the
coping. Adjustable by ± 40 mm.
2.1
Overflow
While positionning the overflow make sure to roll the cover up totally so that the first slat is 10cm under
the water level.
The overflow B should be positioned between 90 and 115mm with respect to the pool level as a function
of the coping 5mm, take care to ensure that the motor gland is not submerged.
By respecting these measurements, the water level lies 20mm under the bottom of the overflow opening;
this minimises the volume of water evacuated to waste when the cover is rolled up.
A
B
40
21
Deck
level
Deck
level
Overflow
level
3.
IMPORTANT : POSITIONING THE LEVER REGULATOR AND
OVERFLOW
3.1
Water level regulator (add water):
While positioning the water level regulator, make sure to roll the cover out totally (the first slat touching the
wall opposite the axle). Position the regulator as shown below:
2019/01 - Indice de révision : N - Code : 34201
PROTECTION & SÉCURITÉ
35/60