Cover the portion of the wall that is underground with a protective layer of foundation grade plastic
film.
•
For backfilling around the pool use stabilised sand (mortar 150 kg/m3). (The materials necessary to
implement these measures are not included in the kit.
3.3
Safety
•
Your installation should comply with the standard C15-100. Notably, the electrical supply of the pump
should be protected by a 30mA differential circuit breaker. (Wiring should be carried out by a qualified
professional).
•
The kit provided will allow installation of the filtration system 3.5 m from the pool, this is in line with
pool safety standards.
We recommend that you secure access to the pool using one of the protective measures set out
in the pool safety standards NF P 90-306, 307, 308 & 309 that is: Barriers - Alarms - Safety covers
- Shelters.
•
Children should only use the pool under the supervision of an adult.
•
Remember to remove the exterior wooden ladder while the pool is not in use to prevent unsupervised
access to the pool.
•
This pool is intended for private use only.
•
Do not install the pool beneath electrical wires.
4.
QUICK OVERVIEW
•
Excavation
•
Assembly of the metal structure
•
Pouring the concrete slab
•
The wooden structure
•
The filtration group
4.1
Tools
•
decameter
•
rope,
•
tube wrench (13 and 17),
•
mallet,
•
screw gun (with a torx, pozi bit),
•
Stanley knife,
•
metal saw,
•
big spirit level,
•
flat head screw driver,
•
cross head screw driver,
•
bolt cutters,
•
sand paper,
•
file,
•
excavation equipment
4.2
Time required
Excavation :
1 TO 2 DAYS (DEPENDING ON THE MATERIALS USED)
Metallic structure: 1
DAY (WITH 2 PEOPLE)
Pouring the slab:
1 TO 2 DAYS (WITH 2 PEOPLE DEPENDING ON THE MATERIALS USED)
Wooden structure and filtration:
2 TO 3 DAYS (WITH 2 PEOPLE - THE TIME INDICATED DOES
NOT INCLUDE THE CONCRETE CURING TIME)
Curing of the concrete slab before filling the pool with water:
21 DAYS (3 WEEKS)