![BWT 3 x 3 Installation And Operating Intructions Download Page 14](http://html1.mh-extra.com/html/bwt/3-x-3/3-x-3_installation-and-operating-intructions_2836675014.webp)
14/48
2019/01 - Indice de révision : A - Code : 97160421
WOODEN POOLS
BWT
myPOOL
HOTLINE
8.
ASSEMBLING THE WALLS
Before starting to assemble the wooden walls, make sure that the finish of the concrete slab is
perfectly smooth and level. Any unevenness will be accentuated and more noticeable once the pool
has been filled with water. If necessary, correct defects by sanding or resurfacing.
Assembly of the wooden structure may begin 2 to 3 days after the slab is poured, it is not
necessary to wait for the concrete to cure completely.
However, you must wait 2 to 3 weeks before filling the pool with water.
Your pool comprises several types of wooden slat, the position of the various types of slat are indicated in
the exploded views.
Please note that the 3 x 3 model is fitted with one skimmer and one return fitting
Pool model
Layout of the flat bars along each
length
Layout of the flat bars along each width
3 x 3
1700 + 1700
1700 + 1700
3 x 6
1700 + 1570 + 1570 + 1700
1700 + 1700
4 x 8
1700 + 1570 + 1070 + 1070 + 1570 + 1700
1700 + 1070 + 1700
PAROI
FEMELLE
1/2 PAROI
FEMELLE
PAROI
MALE-FEMELLE
1/2 PAROI
MALE
Figure 12 – Assembling the walls
The slats comprising your pool are common to several pool models. For information concerning the lengths
of the slats constituting the walls of each pool model, please refer to the table above:
Paint the ends of the slats in the corners with a wood stabiliser to limit deformation over time. This product
is white on application, but becomes colourless when dry. Drying time is 2 to 3 hours. Apply a second layer
if the temperature is high or if the product dries too quickly. Follow the safety instructions printed on the
container. Rinse the brush after use.