21/48
2019/01 - Indice de révision : A - Code : 97160421
WOODEN POOLS
BWT
myPOOL
HOTLINE
12.
MOUNTING THE LINER LOCKING TRACK
Before beginning to mount the liner locking
track, make sure that the structure has been
correctly assembled. To do this: use a spirit
level to verify that the structure is level around
the entire periphery, check that the diagonals
are equal in length, correct any imperfections
before continuing.
Position 2 liner locking track corner pieces in
each corner. (You will find the parts in the liner/
waterproofing kit). You will need to trim an
interlocking pin off each corner piece. Make sure
that the 2 corner parts are level with each other and
flush with the top of the wall. A gap of a few mm
between the two parts is not problematic. Use 4x35
stainless steel screws from bag H.
Figure 27 – Corner liner locking trackr
The track should be perfectly flush with the top
of the wall.
Before fixing the track in position, pre-drill the
holes using the Ø 4mm drill bit provided (bag
J).
emember to deburr the track after making the
cuts..
Take care not to overtighten to ensure that the
screws do not break through the track.
Continue to mount the locking track using the
lengths provided, these should abut the locking
).
Figure 28 – Liner locking track
Insert a screw (stainless steel 4x35 from bag H)
at 20cm intervals. Locking track junctions do not
necessarily line up with the posts.
Towards the end, it will be necessary to trim the
lengths. Cut the length to size between two liner
locking junctions then bend the track to allow the
junction pins to fit into place
Figure 29 – Locking track junction