40
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
Fan output (Fan)
- adjust using gas
analyzer
Mode
: Min Power Setup
– It is
indicated by one flame. We recommend
setup value of
35% (0.35)
of the main
mode.
Pellet auger running time (Feed)
–
1.2
sec. (7.5 kW; 3.3 х 35% = 1.2)
Main combustion cycle (Cycle)
–
20 sec.
(recommended)
Fan output (Fan)
- adjust using gas
analyzer.
CAUTION!
You use a burner
whose carbon footprint values
are approximately (СО
=100
ppm), which is 2.5 times lower
than the maximum allowed
limits for harmful emissions in
the EU Member States. Thus
you can reduce the amount of
harmful emission and contribute
to environment protection.
Important: For each of the
output modes the optimal fan
setting is tweaked by using gas
analyzer to control the oxygen
amount registered by the device
(for Max Power Setup within the
range 8÷10%, and for Min Power
Setup up to 13%). The specific
setting depends also on the
internal resistance of the boiler
combustion chamber on which
the burner has been installed as
well as on the chimney draught.
Therefore it is not possible to
provide here the exact value for
the fan output and it must be
entered by a competent installer
or service technician using gas
analyzer.
12. MOUNTING OF FUEL HOPPER
FH 500-V2
Fuel hopper FH 500-V2 has a capacity
of 500 liters pellets. Its design allowing
installation by choice on either side of
boiler. An important condition is to be
leveled. Before loading the pellets, make
sure that the hopper is clean. Empty the
container for pellet powder and dust.
Fuel hopper hatch-cover must be closed
during operation. Detailed description for
the assembly of a fuel hopper will find
the User manual for assembling the fuel
hopper FH 500-V2.
13. WARRANTY TERMS
The warranty terms are described in the
Service booklet included in the supply.