3.2
Included in the Package
3.3
Location Requirements
ATTENTION
The bed is delivered unassembled and mounted on a storage aid. Assembly takes place on
site by the operator’s technical staff. Assembly can be carried out by one or two persons.
Remove all packaging materials and cable ties before starting to assemble the bed. Observe
the disposal information in the chapter
Note the following safety relevant aspects to take into account when selecting the site of use:
•
There must be sufficient room available to accommodate the bed’s entire range of ad-
justments. Furniture, window sills, sloping roofs, etc. must not impede adjustments.
•
The space underneath the bed must remain free.
•
Before using the bed on parquet flooring, check whether the castors will leave stains on
the parquet varnish. The bed can be used on tiles, carpet, linoleum or laminate flooring
without causing any damage. BURMEIER is not liable for any damage caused by day-
to-day operation on floors.
•
A properly installed 230 volt mains socket must be available close to the bed (if possi-
ble) and available at any time.
•
If any other additional equipment is attached to the bed, (e.g. compressors for position-
ing systems, etc.), ensure that this is securely fastened and is functioning properly. Pay
special attention here to the safe routing of all loose connector cables, tubing, etc. If
you have any queries or concerns, consult the manufacturer of the additional equip-
ment or BURMEIER.
Damage to flooring
Damage to the flooring may occur during assembly and dismantling of the bed caused by
the sharp edges of the chassis or the lying surface.
•
Carefully assemble or dismantle the bed on protective covers to prevent damage to the
flooring.
Assembling the Care Bed
12
Part B: Operator and Technical Personnel
Summary of Contents for Dali
Page 2: ...Part A General Information ...
Page 4: ......
Page 6: ...II ...
Page 30: ...Part B Operator and Technical Per sonnel ...
Page 32: ......
Page 36: ...IV ...
Page 88: ...Part C Care staff and residents ...
Page 90: ......
Page 129: ...Cleaning and Disinfection Part C Care staff and residents 37 ...
Page 130: ...Cleaning and Disinfection 38 Part C Care staff and residents ...
Page 131: ...Cleaning and Disinfection Part C Care staff and residents 39 ...