5
Installation of the boiler
Logano plus SB615 Gas - We reserve the right to make any changes due to technical modifications.
25
Secure all cables with cable clips (included with control
unit). To do this, carry out the following steps:
1. With the cable in place, insert the cable clips, as shown
in Fig. 19, from above into the slits in the clip frame.
2. Slide the cable clamp downwards.
3. Press in.
4. Flip the lever up.
B
Put the cover (
Æ
Fig. 17, page 23) back on the control
unit.
B
Tighten screws (
Æ
Fig. 17, page 23) to secure control
unit cover.
Fig. 19 Securing the cable with cable clips
5.16 Installing the temperature sensor
set
Test point M is located at the top rear of the boiler.
B
Route the capillary tubes with temperature sensors and
quarter dummy plugs to the sensor well in test point M
and insert the temperature sensor into the sensor well
until it bottoms out.
Fig. 20 Inserting temperature sensor into the sensor
well
6720615883-31.1RS
.
.
.
.
.
Observe the following points before installing
the temperature sensor set:
B
Take care to ensure correct cable and
capillary pipe routing.
B
Create a permanent mains power
connection in accordance with EN 50165.
B
Observe all local regulations.