5
Installation of the boiler
Logano plus SB615 Gas - We reserve the right to make any changes due to technical modifications.
28
5.19
Securing the shield, device label and
data plate
B
Fit the decorative panel [1] by inserting the hooks into
the front panel.
B
Fix appliance insignia plate [2] to front panel.
B
Attach the data plate [3] to either the left or right side
panel, depending on which is most convenient.
Fig. 25 Attaching the data plate
1
Restrictor
2
Device label
3
Data plate
5.20 Connecting and filling the
neutraliser (accessory)
Please refer to the separate installation manual for
installation and maintenance of the neutralisation device.
B
Fit the drain hose [1] with a hose clip to the condensate
outlet (siphon).
Fig. 26 Connecting and filling the neutraliser
1
Drain hose
CAUTION:
System damage!
You must ensure that the condensate
generally runs via the flue pipe into the boiler.
If this is not possible, you must only use
stainless steel or plastic tees in the separate
pipe inlet.
B
In ceramic flue systems, you must fit a silt
trap (pot).