13
System inspection and maintenance
Logano G615 - Subject to technical modifications
53
Date:____________
Date:____________
Date:____________
Date:____________
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Company stamp/
signature
Company stamp/
signature
Company stamp/
signature
Company stamp/
signature
Tab. 16 Continuation