7
Boiler block assembly
Logano G615 - Subject to technical modifications
24
7.4
Inserting the supply pipe (parts
crate)
For boilers with 9 – 11 sections, the supply pipe consists
of 2 pieces, and 12 – 16 sections 3 pieces.
B
Push the flat gasket over the supply pipe.
B
Push the supply pipe from the front into the top boiler
hub.
B
Close off with flange cover.
Fig. 22 Sealing in the supply pipe
1
Flat gasket
2
Flange cover
3
Cam
4
Supply pipe
5
Notch in top boiler hub
7.5
Installing sensor well (fittings crate)
Sensor well R ¾ "
B
Seal and install sensor well R ¾ " from the front
(length: 4 21/64" (110 mm)) into the top R ¾ " tapped
hole of the supply connection.
Sensor well R ½ "
B
Seal and install sensor well R ½ " from the front
(length: 4 21/64" (110 mm)) into the lower R ½ "
tapped hole of the supply connection.
Fig. 23 Installing sensor wells
1
Sensor well R ¾ "
2
Sensor well R ½ "
The supply pipe must be fixed in such a way
that the holes on the supply pipe are
positioned at the correct angle. This ensures
optimum distribution of water in the area of
the top boiler hub (Thermostream principle).
B
Make sure that the cam [3]) on the end
plate of the supply pipe (
Æ
Fig. 22, [3]) fits
in the notch in the top boiler hub
(
Æ
Fig 22, [5]).
6 720 642 625-19.1o
2
5
5
1
4
3
3
6 720 642 625-20.1o
2
1