Page 15
CR24 ASPEN LOG SET
(WITH DOUBLE BURNER DX24MV LOG BASE)
WARNING:
POSITIONING OF LOGS IS VERY CRITICAL.
LOG PLACEMENT FOR CR24 ASPEN LOG SET:
1) Align the two holes on the bottom of the rear log #1 over rear base legs and slide down to the supports.
2) Place the middle log (#2) on the support between the front and rear burner sliding log flush to the back of
the support. Center from side to side.
3) Next place front log (#3) behind the front of the andirons, resting on top of its legs. Small notch on the
right of the log (#3) should line up with the right andiron support.
4) Left top log (#4) has two holes provided to fit over the pins in the left side of the middle log (#1) and the
left side front log (#2) to ensure proper fit.
5) Right top log (#5) has a hole to fit over the pins on the right side of the rear log (#1) and the right side
middle log (#2) to ensure proper fit.
Completed Log Placement (Front View)
Completed Log Placement (Left Angle View)
4
1
2
3
5
Summary of Contents for CR18
Page 2: ......
Page 50: ...Page 48 Figure 12 SIT MILLIVOLT VALVE 18 24 BASE...