![BuckMaster CR18 User Manual Download Page 13](http://html1.mh-extra.com/html/buckmaster/cr18/cr18_user-manual_2826049013.webp)
Page 11
CR24 LOG SET
(WITH DOUBLE BURNER DX24MV LOG BASE)
Open the cartons containing the Burner Base and the logs. Inside one of the cartons you will find the
Burner Base. The logs are boxed separately.
CR24: 1) Rear Log, 2) Middle Log, 3) Front Log, 4) Right Top Log, 5) Left Top Log, 6) *Extreme Front
log used only with C24DTB Tri Burner Base.
WARNING:
POSITIONING OF LOGS IS VERY CRITICAL. (See Figure 6.)
LOG PLACEMENT FOR CR24 LOG SETS:
1) Align the two holes on the bottom of the rear log #1 over rear base legs and slide down to the supports.
2) Place the middle log #2 on the support between the front and rear burner sliding log flush to the back of
the support. Center from side to side.
3) Next place front log #3 behind the front of the andirons, resting on top of its legs
4) Right top log #4 has two holes provided to fit over the pins in the right side of the middle log to ensure
proper fit.
5) Left top log #5 has two holes provided to fit over the pins in the left side of the middle log to ensure
proper fit.
1
2
3
5
4
* NOTE: Discard log #6 on
double burner log base.
6
Figure 6
WARNING:
Failure to position the
parts in accordance with these diagrams
or failure to use only parts specifically
approved with this heater may result in
property damage or personal injury.
Summary of Contents for CR18
Page 2: ......
Page 50: ...Page 48 Figure 12 SIT MILLIVOLT VALVE 18 24 BASE...