5 Putting into operation
58
R-220 Pro Continuous Operation Manual, Version A
5 21
Final installation check
After installation has been completed and before performing the first distillation make sure the installa-
tion has been carried out correctly:
X
Inspect glassware visually for possible damage
X
Inspect safe and correct routing of all cables and hoses
X
Check that all connections (steam, water, vacuum) have been fixed properly
X
Check all supply hoses for tightness
X
If applicable: Check overall system vacuum tightness (see operation manual I-300 Pro)