Appendix / Service Details
DOC-M88-EXX268_V1_12.2016
117
10.2.2.2
CHC plus with CCU100 and Corio Water Bath
Do not change the connectors A25D25 and A25D26
The following procedure is suitable for the Anton Paar chamber CHC plus with CCU 100
controller and Corio water bath.
1. Switch on the Anton Paar controller, the MHG controller and the Julabo water bath.
Wait until the booting process is finished. Follow the instructions on the controller.
2. The Julabo Corio water bath must be set to
Remote ON
. Follow the short instruction
in its manual. Press up and down at the same time for ca. 5 seconds and set the
communication to
R ON
.
3. Switch on the diffractometer or reboot the diffractometer.
4. Launch the
DIFFRAC.MEASUREMENT CENTER
[4] program.
5. Switch to the
CONFIGURATION
plugin.
6. Open
Device | Goniometer | Center
and insert a template by pressing the right
mouse button and selecting Import Template (Figure 10.23). If your chamber is
equipped with a motorized Z-stage, you must load the template
Stage_PAAR_CHCplus_LN2Cooling_V2.bfscn
Every time the Corio water bath was switched off, leave it switched off for at least 20
seconds and then switch on again!
CHC plus Version 2 with CCU100 and Corio water bath requires ICS V7
Summary of Contents for Anton Paar
Page 6: ...Contents 6 DOC M88 EXX268_V1_12 2016 ...
Page 12: ...List of Figures 12 DOC M88 EXX268_V1_12 2016 ...
Page 26: ...General Remarks 26 DOC M88 EXX268_V1_12 2016 ...
Page 34: ...Vacuum Equipment 34 DOC M88 EXX268_V1_12 2016 ...
Page 135: ...DOC M88 EXX268_V1_12 2016 135 ...
Page 136: ...Bruker Corporation info baxs bruker com www bruker com Order No DOC M88 EXX268 ...