3-89
Confidential
Encoder strip guard film
(3) At the right end of the CR frame, push the rear end of the guard film spring inwards,
unhook the right end of the encoder strip guard film from the spring, and then unhook the
left end from the CR frame.
(4) Turn the encoder guard film in the direction of the arrow shown below, align the
rectangular hole in the right end of the film with the boss of the strip support and take the
film off. Remove the guard film spring.
(3_079)
Lower cover
Strip support
Encoder strip guard film
Guard film spring
Summary of Contents for DCP-J925DW
Page 17: ...xiv Confidential ...
Page 18: ...xv Confidential ...
Page 19: ...xvi Confidential ...
Page 20: ...xvii Confidential ...
Page 21: ...xviii Confidential ...
Page 44: ...1 23 Confidential 1 0 08 inches 2 mm or greater curve may cause jams to occur ...
Page 140: ...3 3 Confidential 2 PACKING ...
Page 281: ...4 28 Confidential ADF Copy Chart C A B D ...
Page 292: ...5 8 Confidential Print Pattern for Creating Head Calibration Data ...
Page 294: ...5 10 Confidential Scanning Compensation Data List ...
Page 297: ...5 13 Confidential Nozzle Test Pattern ...
Page 300: ...5 16 Confidential Configuration List ...
Page 303: ...5 19 Confidential MFCJ430W J432W MFCJ625DW J825DW Key Entry Order ...
Page 318: ...5 34 Confidential PF EXIT Adjust Check Pattern Paper feed roller ...
Page 319: ...5 35 Confidential EXIT Adjust Check Pattern 1 ...
Page 320: ...5 36 Confidential EXIT Adjust Check Pattern 2 ...
Page 321: ...5 37 Confidential EXIT Adjust Check Pattern 3 ...
Page 322: ...5 38 Confidential KEISEN2 LF300 EXIT ADJUST PATTERN ...
Page 327: ...5 43 Confidential Vertical Alignment Check Pattern ...
Page 331: ...5 47 Confidential Left Right Top and Bottom Margin Check Pattern ...
Page 367: ...6 4 Confidential Power supply PCB 100 V series ...
Page 368: ...6 5 Confidential Power supply PCB 200 V series ...
Page 369: ...6 6 Confidential Wiring diagrams ...