5. DISASSEMBLY
SL-710A
26
5-20. Timing belt
5-21. Spring and feed regulator
1696M
1
Timing belt
[Remove from timing pulley D]
3
Fan
[DD7100
only]
2
Screws
[3 pcs: DD7100 only]
4
Timing belt
[Remove from the arm]
1695M
Note;
For the DD7100A and 710A, the fan and
flange do not need to be removed.
4
Flange
[DD7100 only]
1697M
10
Rubber cap
13
Feed regulator shaft L
14
Washer
11
Set screws [2 pcs: Loosen]
12
Feed regulator support shaft
7
Eccentric pin
9
Stud arm
6
Set screw [Loosen]
5
Spring
1
Bolt
4
Cover stud
3
Washer
2
Spring washer
15
Feed regulator
[Only the top can be removed]
8
Set screws
[2 pcs: Loosen]
Note;
After removing the spring,
reinstall the cover stud if
working on a flat surface.
Summary of Contents for DB2-DD7100
Page 113: ...21 WIRING DIAGRAMS SL 710A 106 Control circuit board assembly 2 6 1934M ...
Page 114: ...21 WIRING DIAGRAMS SL 710A 107 Control circuit board assembly 3 6 1890M ...
Page 115: ...21 WIRING DIAGRAMS SL 710A 108 Control circuit board assembly 4 6 1891M ...
Page 116: ...21 WIRING DIAGRAMS SL 710A 109 Control circuit board assembly 5 6 1892M ...
Page 117: ...21 WIRING DIAGRAMS SL 710A 110 Control circuit board assembly 6 6 1893M ...
Page 136: ...21 WIRING DIAGRAMS SL 710A 129 21 4 Transformer 1912M ...
Page 137: ...21 WIRING DIAGRAMS SL 710A 130 21 5 Operation panel B 40 Operation panel B 40 1 3 1913M ...
Page 138: ...21 WIRING DIAGRAMS SL 710A 131 Operation panel B 40 2 3 1914M ...
Page 139: ...21 WIRING DIAGRAMS SL 710A 132 Operation panel B 40 3 3 1915M ...
Page 140: ...21 WIRING DIAGRAMS SL 710A 133 21 6 Operation panel B 100 Operation panel B 100 1 3 1916M ...
Page 141: ...21 WIRING DIAGRAMS SL 710A 134 Operation panel B 100 2 3 1917M ...
Page 142: ...21 WIRING DIAGRAMS SL 710A 135 Operation panel B 100 3 3 1918M ...