Chapter 1 Preparation of Embroidery Machine
BES-941BC • BES-1241BC
21
a
a
Center pillar
Lift forks
The central seal
Embroidery machines should be installed only
by trained engineers.
Electric wiring should be laid by your distribu-
tor or electric experts.
A machine weighs more than 600 kg. Installa-
tion should be carried out by 4 or more work-
ers.
Do not connect the power source until installa-
tion is completed. Doing so may start the ma-
chine unintentionally through an accidental
activation of the START switch, resulting in
bodily injuries.
Install a machine in a place away from a high-
frequency welding machine or other machines
that may generate a strong electric noise. Fail-
ure to do so may cause the embroidery machine
to malfunction.
Be sure to connect the ground. If the ground
connection is not secure, you run a high risk of
receiving a serious electric shock, and problems
with correct operation may also occur.
Secure the machine with the casters when in-
stalling it so that it will not move by placing the
leveling seat on the sound floor.
3. Installation
* After installation is completed, get the power supply from a dedicated outlet.
* When connecting multiple machines, exercise care not to exceed the capacity of the outlet.
3-1 Transportation of Machine
When relocating the machine, push the steel frame.
Note) Never push the cover or carriage.
When using a fork lift
DANGER
Open the forks of the lift to both sides evenly from the central seal positioned at the center
(viewed from the rear of the machine), and pass them under the legs to lift the machine.
Summary of Contents for BES-1241BC
Page 7: ...5 BES 941BC BES 1241BC 2 1 7 1 6 3 4 5 7 3 2 Belt cover Finger guard BES 941BC ...
Page 13: ...11 BES 941BC BES 1241BC Setting of thread breakage sensor page 94 Setting of Machine page 97 ...
Page 18: ...16 BES 941BC BES 1241BC ...
Page 19: ...Chapter 1 Preparation of Embroidery Machine ...
Page 50: ...Chapter 1 Preparation of Embroidery Machine BES 941BC BES 1241BC 48 ...
Page 60: ...BES 941BC BES 1241BC 58 Chapter 2 Embroidering Procedures ...
Page 125: ...Chapter 6 Operation of Machine ...
Page 136: ...Chapter 6 Operation of Machine BES 941BC BES 1241BC 134 ...
Page 137: ...Chapter 7 Maintenance ...
Page 148: ...Chapter 7 Maintenance BES 941BC BES 1241BC 146 ...
Page 149: ...Chapter 8 Standard Adjustment ...
Page 161: ...Chapter 9 List of Error Messages ...
Page 166: ...BES 941BC BES 1241BC 164 Chapter 9 List of Error Messages ...
Page 179: ...Connection and Installation of Optional Equipment ...