
Items included with the ICX 6400-EPS1500
The ICX 6400-EPS1500 ships with all of the following items included in your shipping container. Verify the contents of your shipping
container. If any items are missing, contact the place of purchase.
•
ICX 6400-EPS1500 external power supply
•
Read Me First document
•
Rack mounting kit containing two L-shaped mounting brackets and six sink-head screws
•
Two-post rack kit containing four rack-mounting screws and four cage nuts
•
EPS AC power cord
•
EPS power cord retainer clip
•
Four rubber feet
•
EPS cord kit that contains:
–
Three EPS power cords
–
Three wire saddles
–
Three cable ties
•
China ROHS sheet
General requirements
To manage the ICX 6400-EPS1500, you will need a management station, such as a PC running a terminal emulation application, for
serial connection to the switch. Use the serial connection to perform basic configuration tasks, including assigning an IP address and
network mask to the system. This information is required to manage the system using the CLI through Telnet or Brocade Network
Advisor.
Summary of installation tasks
Follow the steps in the following table to install your device. Details for each of these steps are provided on the pages indicated.
TABLE 12
Installation tasks
Task number
Task
Where to find more information
1
Ensure that the physical environment that will
host the device has the proper cabling and
ventilation.
Preparing the installation site
on page 55
section
2
Unpack the device and all included accessories.
Items included with the ICX 6400-EPS1500
page 53 section
3
Install the device on a desktop, or in an
equipment rack.
4
Once the device is installed, plug the device into
a nearby power source that adheres to the
regulatory requirements outlined in this manual.
5
Verify that the device is working properly by
plugging it into a power source and verifying that
it passes the self test.
Summary of installation tasks
Brocade ICX 6430 and ICX 6450 Stackable Switches Hardware Installation Guide
Part Number: 53-1003617-03
53