©Copyright 2010 BRIGHT BLUE, LDA
33
V2016
The information in this document might be changed without previous notice
6
Insta
ll
a
tion
The SANUS installation procedures are divided in two main steps: hydraulics and
electrical components.
The controller must be installed vertically, on a flat surface, keeping at least a 15cm
distance from the wall or any other component to ensure proper ventilation (avoid
keeping the acid tank bellow any equipment since it promotes corrosion).
Make sure that all the hydraulic circuits are shut and that the power supply is isolated
before starting the installation.
Figure 15- Hydraulics
6.1
Hydraulic Installation
6.1.1
Injection Point
The pH solution injection is the last element in the circuitry, just before de cut valve, as
shown in Figure 2. The injector must be connected using a T with a ½” exit, or a clamp
saddle with a ½” exit. The injection point is above or below the pump, according to the
type of pump present, as shown in Figure 3 (see the pump manual for further
instructions).
Figure 16 – Dosing Pump
Summary of Contents for SANUS
Page 1: ...SANUS CONTROLADOR DE PH PH CONTROLER Espa ol 17 Portugu s 3 English 29...
Page 2: ......
Page 45: ......