Positioning and Clearance Checklist
Is the lift centered in the door opening with the lift base plate parallel (aligned) with the
door opening (at floor level)?
Viewing the lift from outside the vehicle:
Are the vertical arms and platform aligned and parallel with the sides of the door jamb
(page 25 - points 8 and 9)?
Note:
The lift towers (upright supports) should be per-
pendicular (90
°
) to the vehicle floor.
Viewing the lift from “pump side” to “opposite pump side” of the vehicle:
Are the vertical arms and parallel arms aligned and parallel with each other (page 25 -
point 10)?
Are the towers (upright supports) perpendicular (90
°
) to the vehicle floor
except when
base plate wedges are used
(page 25 - point 11)?
Viewing the lift from outside the vehicle, when unfolding and folding the lift:
Do the vertical arms and parallel arms clear the door opening (vertical sides) as the lift
unfolds and folds (page 25 - points 1 and 2)?
Is there a
minimum 1/8" clearance
between the deployed bridge plate and any
obstruction on the vehicle floor (page 25 - point 4)?
Is the floor level positioning correct, and does the automatic inboard roll stop rest fully
on the lift base plate when the platform is positioned at floor level as detailed on pages
30 and 31?
Is the hydraulic platform sensor (fold) pressure switch properly adjusted (as detailed
on page 43)?
Do the handrails operate properly (folding/unfolding) and are the handrails properly
aligned (during all lift functions)?
✓