background image

3

Installation 

S19-310BF

Bradley Corporation • 

215-619 Rev. H; ECN 08-512 

9/11/08

Installation

Supplies Required:

•  (3) 3/8" floor anchors and bolts
•  Teflon tape and pipe sealant
•  Piping to 1-1/4" NPT water supply inlet and 1-1/4"  

NPT drain outlet on unit

•  Adequate supply pipe supports
•  Minimum 4" (102mm) drain to accommodate 30 

gallons (115 liters) per minute discharge for shower 
waste

•  OPTIONAL: sign-mounting hardware

NOTE: Local codes may require the installation 
of a backfl ow prevention valve to complete proper 
installation. Compliance with local codes is the 
responsibility of the installer. Valve must be tested 
annually to verify that it is functioning properly. Backfl ow 
prevention valves are not included with the fi xture and 
may be supplied by the contractor or purchased from 
Bradley Corporation.

Step 1: Secure base to floor

1.  Install three suitable anchors (supplied by installer) 

for 3/8" bolts in the floor.

2.  Bolt the base to the floor anchors using 3/8" bolts 

(supplied by installer).

Step 2: Assemble components

1.  Assemble the remaining unit components as 

shown on page 4.

•  Apply pipe sealant (by installer) to all male-

threaded pipe joints.

•  Use the rubber grip pad provided or a strap 

wrench around pipes when tightening to prevent 
marring. Place the grip pad on the pipe, then 
put the wrench over the grip pad and turn the 
pipe with the wrench.

•  Thread the jam nut onto the threaded end of the 

pull rod. Thread the pull rod onto the coupling 
and tighten the jam nut. 

The triangular end of 

the pull rod must be in line with the hook 
end

 (see page 4).

•  Bottom edge of the showerhead should be 7'-1" 

(2160mm) from floor.

Step 3: Connect water supply

IMPORTANT:  Do not rely on Bradley’s 
Combination Unit to support supply piping.

1.  Connect water supply piping to 1-1/4" NPT inlet 

(piping by installer). Provide adequate supports 
(by installer) for supply pipe using pipe hangers or 
other means.

2.  Connect drain piping to 1-1/4" NPT drain outlet 

(piping by installer).

3.  Hang the safety sign from the unit with the curtain 

hooks provided (or mount it to the wall using sign-
mounting hardware by installer).

NOTE:  All dimensions assume standard thread 
engagement. Variations in manufacturing allow for 
+/- 1/8" (3mm) per threaded joint. To fi nd the tolerance 
of a dimension, add the number of thread joints in 
between a dimension and multiply it by 1/8" (3mm).

Top View From Bowl

31"

(787mm)

65-1/2" 

(1664mm) 

to fl oor

 48"

(1219mm)

33-3/8"

(848mm)

27" 

(686mm)

Ø 9" (229mm) 

Flange with (3) 

Ø 3/8" (10mm) 

Holes on Ø 8" 

(203mm) Bolt 

Circle

7'-1" 

(2160mm) 

to fl oor

18-3/4" 

(476mm)

10-3/8" 

(264mm)

5-1/2" 

(140mm)

6" 

(152mm)

Ø 

10-3/4" 

(273mm)

4-1/2"

(114mm)

Ø 

3.1" 

(78.7mm)

9" 

(229mm)

Summary of Contents for S19-310BF

Page 1: ...uche oculaire sans barri re Combinaci n de ducha de aspersi n y lavaojos de f cil acceso Table of Contents Pre Installation Information 2 Installation Instructions 3 Assembly of Components 4 Parts Lis...

Page 2: ...per operation This equipment should be inspected annually to ensure compliance with ANSI Z358 1 Workers who may come in contact with potentially hazardous materials should be trained regarding the pla...

Page 3: ...h around pipes when tightening to prevent marring Place the grip pad on the pipe then put the wrench over the grip pad and turn the pipe with the wrench Thread the jam nut onto the threaded end of the...

Page 4: ...i ne va pas fait un rapport imm diatement P O BOX 309 MENOMONEE FALLS WI 53052 0309 USA TEL 1 800 BRADLEY FAX 262 251 5817 http www bradleycorp com 114 052 10 2 4 23 4 1 4 3 4 4 4 5 4 6 4 7 4 8 4 9 4...

Page 5: ...9 087 1 Spray Ring Assy 4 12 110 199 1 Acorn Nut 5 113 006NE 1 Pipe 1 1 4 NPT x 32 1 2 6 113 006LW 1 Pipe 1 1 4 NPT x 22 1 2 7 169 722 1 Reducing Tee 8 169 724 1 Pipe Plug 1 1 4 NPT 9 269 434 1 Pipe 1...

Page 6: ...es d inspection Ce mat riel doit tre inspect une fois par an pour assurer sa conformit la norme ANSI Z358 1 Les ouvriers susceptibles d entrer en contact avec des mati res potentiellement dangereuses...

Page 7: ...mpons autour des tuyaux pour ne pas les endommager lors du serrage Placez le tampon sur le tuyau puis la cl par dessus Laissez le tampon en place et tournez le tuyau avec la cl Amorcer le contre crou...

Page 8: ...EE FALLS WI 53052 0309 USA TEL 1 800 BRADLEY FAX 262 251 5817 http www bradleycorp com 114 052 10 2 4 23 4 1 4 3 4 4 4 5 4 6 4 7 4 8 4 9 4 10 4 11 4 12 2 3 4 5 6 7 8 9 10 11 12 13 1 4 261 2 16 17 15 1...

Page 9: ...Anneau de douchage 4 12 110 199 1 crou 5 113 006NE 1 Tuyau 1 1 4 NPT x 32 1 2 6 113 006LW 1 Tuyau 1 1 4 NPT x 22 1 2 7 169 722 1 T de r duction 8 169 724 1 Bouchon 1 1 4 NPT 9 269 434 1 Tuyau 1 NPT x...

Page 10: ...inspeccionar probar y anotar semanalmente para mantener un funcionamiento adecuado Se debe revisar este equipo anualmente para asegurarse de que cumpla con la norma ANSI Z358 1 Los trabajadores que pu...

Page 11: ...talador Paso 2 Montar los componentes 1 Montar primero los componentes de la ducha de alto flujo y luego montar los componentes del mecanismo para el lavado de los ojos p gina 12 Aplicar sellador de t...

Page 12: ...52 0309 USA TEL 1 800 BRADLEY FAX 262 251 5817 http www bradleycorp com 114 052 10 2 4 23 4 1 4 3 4 4 4 5 4 6 4 7 4 8 4 9 4 10 4 11 4 12 2 3 4 5 6 7 8 9 10 11 12 13 1 4 261 2 16 17 15 18 19 10 3 10 21...

Page 13: ...ilatorio 4 10 124 055 2 Anilla cu druple 4 11 139 087 1 Conj de la anilla rociadora 4 12 110 199 1 Tuerca de capuch n 5 113 006NE 1 Tubo 1 1 4 NPT x 32 1 2 6 113 006LW 1 Tubo 1 1 4 NPT x 22 1 2 7 169...

Reviews: