Bradley S19-310BF Installation Manual Download Page 2

2

S19-310BF

 

Installation

9/11/08 

Bradley Corporation • 

215-619 Rev. H; ECN 08-512

IMPORTANT

Read this installation manual completely to ensure proper installation, then file it 
with the owner or maintenance department. Compliance and conformity to drain 
requirements and other local codes and ordinances is the responsibility  of the installer.

Separate parts from packaging and make sure all parts are accounted for before 
discarding any packaging material. If any parts are missing, do not begin installation 
until you obtain the missing parts.

Flush the water supply lines before beginning installation and after installation is 
complete. Test the unit for leaks and adequate water flow. Main water supply to the 
eyewash should be “ON” at all times. Provisions shall be made to prevent unauthorized 
shutoff.

 The ANSI Z358.1 standard requires an uninterruptible supply of flushing fluid at a 
minimum 30 PSI (0.21 MPa) flowing pressure. Flushing fluid should be tepid per ANSI 
Z358.1.

The inspection and testing results of this equipment should be recorded weekly to verify 
proper operation. This equipment should be inspected annually to ensure compliance 
with ANSI Z358.1.

Workers who may come in contact with potentially hazardous materials should be 
trained regarding the placement and proper operation of emergency equipment per ANSI 
Z358.1.

For questions regarding the operation or installation of this product, visit www.
bradleycorp.com or call 1-800-BRADLEY. 

Product warranties and service parts information may also be found under ”Products” 
on our web site at www.bradleycorp.com.

Installation

THIS
SIDE

UP

Packing List




P.

O

. B

ox

 3

09

, M

en

om

on

ee

 F

all

s,

 W

I 5

30

51

R

TE

S

TH

IS

 U

N

IT

 E

A

C

H

 W

E

E

K

Te

st-o

perate v

alv

e(s) ea

ch w

eek an

d sign 

belo

w

.

R

epor

t an

y m

alfunction

s immed

iat

el

y.

Ve

ntil(e) w

öc

hen

tlic

h im 

Te

stbe

trie

b prüf

en,

 b

est

ätigt 

dur

ch U

nter

sc

hrift.

 J

eglic

he S

törun

g s

of

or

t m

elden.

 

Date

Datum

Date

Signed

Unter

sc

hrift

Signe

Date

Date

Date

Signed

Signed

Signed

D

IE

S

E

S

 G

E

R

ÄT

 1

S

W

Ö

C

H

E

N

TL

IC

H

 Z

U

 P

R

Ü

FE

N

.

E

S

S

A

I H

E

B

D

O

M

A

D

A

IR

E

Te

st le

 fo

nctio

nnem

ent d

es v

alv

es

 c

haque sem

aine et 

sign

e en b

as.

 S

'il y

 à quelqu

e c

ho

se qui n

e v

a p

as fait  

un

 rappor

t im

m

édiatem

ent.

 

P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA

TEL: 1-800-BRADLEY    FAX: (262-251-5817)

http://www.bradleycorp.com

114-051

Summary of Contents for S19-310BF

Page 1: ...uche oculaire sans barri re Combinaci n de ducha de aspersi n y lavaojos de f cil acceso Table of Contents Pre Installation Information 2 Installation Instructions 3 Assembly of Components 4 Parts Lis...

Page 2: ...per operation This equipment should be inspected annually to ensure compliance with ANSI Z358 1 Workers who may come in contact with potentially hazardous materials should be trained regarding the pla...

Page 3: ...h around pipes when tightening to prevent marring Place the grip pad on the pipe then put the wrench over the grip pad and turn the pipe with the wrench Thread the jam nut onto the threaded end of the...

Page 4: ...i ne va pas fait un rapport imm diatement P O BOX 309 MENOMONEE FALLS WI 53052 0309 USA TEL 1 800 BRADLEY FAX 262 251 5817 http www bradleycorp com 114 052 10 2 4 23 4 1 4 3 4 4 4 5 4 6 4 7 4 8 4 9 4...

Page 5: ...9 087 1 Spray Ring Assy 4 12 110 199 1 Acorn Nut 5 113 006NE 1 Pipe 1 1 4 NPT x 32 1 2 6 113 006LW 1 Pipe 1 1 4 NPT x 22 1 2 7 169 722 1 Reducing Tee 8 169 724 1 Pipe Plug 1 1 4 NPT 9 269 434 1 Pipe 1...

Page 6: ...es d inspection Ce mat riel doit tre inspect une fois par an pour assurer sa conformit la norme ANSI Z358 1 Les ouvriers susceptibles d entrer en contact avec des mati res potentiellement dangereuses...

Page 7: ...mpons autour des tuyaux pour ne pas les endommager lors du serrage Placez le tampon sur le tuyau puis la cl par dessus Laissez le tampon en place et tournez le tuyau avec la cl Amorcer le contre crou...

Page 8: ...EE FALLS WI 53052 0309 USA TEL 1 800 BRADLEY FAX 262 251 5817 http www bradleycorp com 114 052 10 2 4 23 4 1 4 3 4 4 4 5 4 6 4 7 4 8 4 9 4 10 4 11 4 12 2 3 4 5 6 7 8 9 10 11 12 13 1 4 261 2 16 17 15 1...

Page 9: ...Anneau de douchage 4 12 110 199 1 crou 5 113 006NE 1 Tuyau 1 1 4 NPT x 32 1 2 6 113 006LW 1 Tuyau 1 1 4 NPT x 22 1 2 7 169 722 1 T de r duction 8 169 724 1 Bouchon 1 1 4 NPT 9 269 434 1 Tuyau 1 NPT x...

Page 10: ...inspeccionar probar y anotar semanalmente para mantener un funcionamiento adecuado Se debe revisar este equipo anualmente para asegurarse de que cumpla con la norma ANSI Z358 1 Los trabajadores que pu...

Page 11: ...talador Paso 2 Montar los componentes 1 Montar primero los componentes de la ducha de alto flujo y luego montar los componentes del mecanismo para el lavado de los ojos p gina 12 Aplicar sellador de t...

Page 12: ...52 0309 USA TEL 1 800 BRADLEY FAX 262 251 5817 http www bradleycorp com 114 052 10 2 4 23 4 1 4 3 4 4 4 5 4 6 4 7 4 8 4 9 4 10 4 11 4 12 2 3 4 5 6 7 8 9 10 11 12 13 1 4 261 2 16 17 15 18 19 10 3 10 21...

Page 13: ...ilatorio 4 10 124 055 2 Anilla cu druple 4 11 139 087 1 Conj de la anilla rociadora 4 12 110 199 1 Tuerca de capuch n 5 113 006NE 1 Tubo 1 1 4 NPT x 32 1 2 6 113 006LW 1 Tubo 1 1 4 NPT x 22 1 2 7 169...

Reviews: