Page 55
9e1034
HandyFloor lifting
unit
Check whether chains are slack ¹
HandyFloor frame
Check p
lastic gratings for cracks.
Cracked gratings must be replaced.
After
3000 hrs or annually
HandyFloor lifting
unit
Check spindle motor for external damage and leaks.
Check adjusting sheath for wear.
Check chain for wear and corrosion
Retighten a
ll bolts.
HandyFloor
c
ontrol
unit
/operation
Open control unit and check for moisture
Check
if
rubber caps on the pushbuttons are tight
Every 2-5 years
HandyFloor lifting
unit
Check all plastic wheels for play
Every 2 years
¹ If some of the chains are “slack”
,
the floor must be adjusted. Before the chains are adjusted,
check
whether
the floor can move freely in the guides.
After 5
0 hrs or
1 week
10. APPENDIX
10.1 SERVICE SCHEDULE FOR HANDYFLOOR MODEL 2015
Summary of Contents for HandyFloor 2015
Page 32: ...Page 32 9e1034...
Page 44: ...Page 44 9e1034...
Page 49: ...L N L1 F1 F2 N 5 6 7 0 L N 1 2 3 3 4 Page 49 9e1034 9 3 CONTROL UNIT WITH 2 SPINDLE MOTORS...
Page 53: ...Page 53 9e1034 9 6 ELECTRICAL PARTS...
Page 56: ...Page 56 9e1034...
Page 57: ......