1 689 978 572
2014-06-06
|
Robert Bosch GmbH
42 | VLS 5140 | Installation
en
2.4.3
Procuring the shear connectors
The shear connectors are not included in the scope of
delivery and must be provided by the user.
Recommended shear connectors:
Specifications
Designation, value
Qty.
28 items
Type
Hilti HVA/HAS-M16x125
Anchor length
Refer to Fig. 3
Min. substrate thickness
210 mm
Min. hole depth
125 mm
Embedment depth
125 mm
Drill
Dia. 18 mm
Tightening torque
80 Nm
i
Shear connectors from other manufacturers may
be used, provided that they are approved by the
building authorities for use in the compression and
tension zone of the concrete. The fitting instructions
of the screw anchor manufacturer must be observed.
i
The shear connectors must penetrate the
subconcrete. The anchor length must be selected
in accordance with the floor structure over the
subconcrete:
s
t
g
h
L
B
Fig. 3:
Calculating the anchor length
L Anchor length
g Visible thread length
t Thickness of base plate of lifting platform column
s Thickness of floor screed, including tiles
h Embedment depth (as specified by screw anchor manufacturer)
B Thickness of concrete (see section 2.4.2)
The embedment depth h and hole depth h+s are
specified by the screw anchor manufacturer. This
results in a minimum anchor length of L = h + s + t + g.
2.4.4
Laying the electrical connections
¶
Route the supply cable to the installation location.
!
Fusing for the electrical connection must be
provided on site.
2.4.5
Routing the compressed air connection
¶
Route the compressed air connection to the
installation location.
!
The compressed air must be directed through
a service unit located in the vicinity of the lifting
platform.
i
The service unit is not included in the scope of
delivery for the lifting platform.
Suitable service unit:
Item/component
Part number
Service unit, 0 – 10 bar, complete
(water separator, filter, pressure reducer,
lubricator)
1 692 872 365
3.
Installation
3.1
Definitions
The lifting platform components are described in the
original operating instructions.
i
The terms "left", "right", "front", and "rear" relate to
the direction of travel of the vehicle.
3.2
Hazard warnings
DANGER – Incorrectly installed lifting platform!
Risk of (fatal) injury due to the vehicle falling
or tipping during lifting or lowering and when
working on the vehicle.
¶
Installation must only be performed by
Bosch customer service or an authorized
service outlet in accordance with these
assembly instructions.
¶
Only install the lifting platform once
all requirements are satisfied and the
completeness of the scope of delivery has
been verified.
Summary of Contents for VLS 5140
Page 2: ...1 689 978 572 2014 06 06 Robert Bosch GmbH 2 VLS 5140 2VLS 5140 de ...
Page 407: ...1 689 978 572 2014 06 06 Robert Bosch GmbH 398 VLS 5140 电路图 cs 插图 40 电路图 2b 带车轮自由抬升器 ...
Page 409: ...1 689 978 572 2014 06 06 Robert Bosch GmbH 400 VLS 5140 电路图 cs 插图 42 电路图 3b 带车轮自由抬升器 ...
Page 411: ...1 689 978 572 2014 06 06 Robert Bosch GmbH 402 VLS 5140 电路图 cs 插图 44 电路图 4b 带车轮自由抬升器 ...
Page 412: ...1 689 978 572 2014 06 06 Robert Bosch GmbH 电路图 VLS 5140 403 cs ...