7.5.11 Initial lubrication of the conveyor chain
Fig. 38:
562 240-22
Initial lubrication of the conveyor chain
Please note:
• Lubricate the conveyor
chain before initial
start-up and after longer
downtimes, then every
1,000 h, with Structovis
GHD,
0 842 904 229.
Required lubricant
quantity:
2 g/m chain length
Size b
L
[mm]
Chain
length [m]
240
0.75
320
0.86
400
0.98
480
1.12
640
1.41
44/72 Assembly
Bosch Rexroth AG
, MIT: HQ 2/U-H, 3 842 562 241/2019-04