628 & 698 Models
70
Water Tubing Replacement - Step by Step Guide
1. Remove the two retaining
screws from the back of top
lid and remove lid.
2. Disconnect existing white
tubing from push-fit elbow
on cold tank as shown.
3. Disconnect other end of
existing white tubing from
bulkhead fitting inside and at
the back of the lower
compartment.
4. Draw out the existing tubing
from the top and discard.
5. Rotate the push-fit elbow
one-half turn
6. Take the replacement tubing,
(as supplied) and straighten
one end. Insert the
straightened end into the
same tank shelf cut-out as
the existing tube was
withdrawn from, taking care
to pass through to the right
hand side of the existing
wiring loom.
Summary of Contents for 628
Page 1: ...INSTALLATION OPERATION GUIDE 628 698 MODELS ...
Page 3: ...Section1 Technical Manual ...
Page 7: ...Section 2 Technical Manual ...
Page 19: ...Section 3 Technical Manual ...
Page 23: ...Technical Manual Section 4 ...
Page 35: ...Section5 Technical Manual ...
Page 40: ...628 698 Models 40 Borg Overstrom 628 698 Cold Ambient Ambient Electrical Diagram ...
Page 41: ...628 698 Models 41 Borg Overstrom 628 698 Hot Cold Production series No 10 ...
Page 42: ...Technical Manual Section6 ...
Page 47: ...Section7 Technical Manual ...
Page 58: ...Technical Manual Section8 ...
Page 75: ...Notes ...
Page 76: ...Notes ...
Page 77: ...Notes ...
Page 78: ...Notes ...
Page 79: ...Notes ...
Page 80: ...Notes ...