![Borg & Overstrom 628 Installation & Operation Manual Download Page 71](http://html.mh-extra.com/html/borg-and-overstrom/628/628_installation-and-operation-manual_2788485071.webp)
628 & 698 Models
71
7. Continue to feed the end of
the tube downwards and
through the cut-out in the
next shelf panel also, and
into the lower compartment
8. Connect the tubing to the
Bulkhead fitting (if required)
9. Route the replacement tube
clockwise around the top
tank as shown and connect to
the push-fit elbow joint. AS
with any push-fit joints,
ensure the tubing is fully
inserted into joint and gently
pull back on the tubing to
lock into position.
10. Refit the top lid and secure
with the two screws. The
task is now complete.
In the event that you have any questions or queries then please
call Technical Support on 0845 450 30 90
Water Tubing Replacement- Step by Step Guide continued
Summary of Contents for 628
Page 1: ...INSTALLATION OPERATION GUIDE 628 698 MODELS ...
Page 3: ...Section1 Technical Manual ...
Page 7: ...Section 2 Technical Manual ...
Page 19: ...Section 3 Technical Manual ...
Page 23: ...Technical Manual Section 4 ...
Page 35: ...Section5 Technical Manual ...
Page 40: ...628 698 Models 40 Borg Overstrom 628 698 Cold Ambient Ambient Electrical Diagram ...
Page 41: ...628 698 Models 41 Borg Overstrom 628 698 Hot Cold Production series No 10 ...
Page 42: ...Technical Manual Section6 ...
Page 47: ...Section7 Technical Manual ...
Page 58: ...Technical Manual Section8 ...
Page 75: ...Notes ...
Page 76: ...Notes ...
Page 77: ...Notes ...
Page 78: ...Notes ...
Page 79: ...Notes ...
Page 80: ...Notes ...