12/20
Quick Start Guide ACT
81
GB
No.
Description
No.
Description
370
Rated Voltage
374
Rated Cosine Phi
371
Rated Current
375
Rated Frequency
372
Rated Speed
376
Rated Mech. Power
•
Use the arrow keys to select the required parameter and edit the
parameter value.
•
Use the ENT key to confirm the selected parameter and the parameter
values entered.
The rated data of the motor are to be entered according to the
specifications on the rating plate for the motor connection type used
(star or delta connection). If the data entered deviate from the rating
plate, the parameters will not be identified correctly. The rated data
is to be parameterized as per the motor rating plate. Consider the
increased rated current of the connected three-phase motor when
the motor is switched from star to delta.
After input of the machine data, the calculation or
examination of the parameters is automatically started. The
display changes over to "CALC" for a short time. If the
verification of the entered machine data is successful, the
guided commissioning procedure continues with the
identification of the parameters (automatic measurement of
further machine data).
•
Note the warnings and error messages displayed during guided
commissioning.
•
To ignore the warning messages, press the ENT key. The guided
commissioning is continued. However, it is recommended that the data be
checked and corrected if necessary.
•
To correct the entered parameter values after the warning or error
message, press the ESC key. Use the arrow keys to switch to the
parameter value which is to be corrected.
Further machine data are measured while the drive is at a
standstill. These measurements will be entered
automatically in the relevant parameters by the parameter
identification feature.
•
Confirm the display "PAidE" by pressing the ENT key.
Summary of Contents for ACTIVE ACT2 Series
Page 1: ...Quick Start Guide 132 kW...
Page 2: ......
Page 3: ......
Page 4: ......
Page 13: ...12 20 Quick Start Guide ACT 11 I Grandezza 5 c c1 a a1 a2 x b b1 x x 100 mm...
Page 15: ...12 20 Quick Start Guide ACT 13 I Grandezza 6 a a1 a2 x x 100 mm b b1 x c c1...
Page 62: ...60 Quick Start Guide ACT 12 20 GB Size 5 c c1 a a1 a2 x b b1 x x 100 mm...
Page 64: ...62 Quick Start Guide ACT 12 20 GB Size 6 a a1 a2 x x 100 mm b b1 x c c1...
Page 112: ...110 Quick Start Guide ACT 12 20 D Baugr e 5 c c1 a a1 a2 x b b1 x x 100 mm...
Page 114: ...112 Quick Start Guide ACT 12 20 D Baugr e 6 a a1 a2 x x 100 mm b b1 x c c1...
Page 161: ...12 20 Quick Start Guide ACT 159 F Taille constructive 5 c c1 a a1 a2 x b b1 x x 100 mm...
Page 163: ...12 20 Quick Start Guide ACT 161 F Taille constructive 6 a a1 a2 x x 100 mm b b1 x c c1...
Page 212: ...210 Quick Start Guide ACT 12 20 E Tama o 5 c c1 a a1 a2 x b b1 x x 100 mm...
Page 214: ...212 Quick Start Guide ACT 12 20 E Tama o 6 a a1 a2 x x 100 mm b b1 x c c1...
Page 255: ......
Page 256: ......
Page 257: ......
Page 258: ...COD VEC 370 R4...