Bomecon I-BOOM 12 Instruction Manual Download Page 17

Manual I-Boom 12

7. Operation:

The underlined text is a button marked on the cabinet. The controls on the box is marked

with italic text.

7.1 Accident Prevention:

When working with this tool and performing tool maintenance, the provisions of the

relevant Dutch safety precautions must be taken.

For safe operation, careful instruction of operating personnel is absolutely necessary. The

safety instructions should always be stored in the vicinity of the operator.

The following regulations must be observed.

7.1.1. Duties of the operating personnel.

- The operating personnel must be able to visually assess the tool.

- The operating personnel must control both the tool and the transmitter.

- The operating personnel must check the proper operation of the brakes and limit

switches before commencing work.

- If defects endanger the proper operation of the tool the work should be stopped

immediately.

- Operators have the duty to report any defects to the responsible safety officer, and also

new operating personnel during shift rotation.

- Control switches may only be operated from the control position.

- The tool must not be mounted above a heat source.

7.2 Switching on the Tool:

Check that the red signal lamp is illuminated.

- If the red signal lamp is not illuminated, set the main switch of the tool and the counter

ballast wagon to 1.

Check the E-meter of the tool and the counter ballast wagon. See if there is sufficient

voltage in the batteries. At least three LED lights must be lit.

- If there is insufficient voltage in the batteries charge the batteries until at least three

LED lights are lit.

There is now enough voltage in the batteries. The tool is ready for use.

7.2.1 Switching on the transmitter.

Before the tool can be operated the transmitters must be turned on.

Follow the steps of the manual 'transmitter micron 4' on page 7.

When the indicator on the transmitter flashes red and an audible signal sounds, the

battery must be recharged. If not replaced the transmitter will automatically be switched

off after a few minutes.

Load the empty battery immediately in the accompanying charger. (See operating

instructions 'transmitter micron 4', page 9,10 and 11.)

Summary of Contents for I-BOOM 12

Page 1: ...utomatiseerd gegevensbestand of openbaar gemaakt in enige vorm of op enige wijze hetzij elektronisch mechanisch door fotokopie n opnamen of op enige andere manier zonder voorafgaande schriftelijke toe...

Page 2: ...ring business page 14 4 6 Suggestions for work on electrical page 14 5 Description of the machine 5 1 General page 16 5 2 Required Equipment page 16 5 2 1 Radio Control page 16 5 2 2 E meter page 16 5...

Page 3: ...Rotating frame page 23 7 10 Emergency page 23 7 11 Last disconnecting page 23 7 12 End of day page 23 8 Decommissioning 8 1 Emergency switch page 24 8 2 out of operation at the end of time page 24 8...

Page 4: ...ks with this machine All technical or technological information and posted drawings in this manual remain the property of BOMECON NIJKERK and may not be used without written permission The information...

Page 5: ...ed on our accumulated knowledge and information gathered so far We retain the right to make technical changes at any time within the limits of the rules set to the I boom related business No rights ca...

Page 6: ...by the owner of the I BOOM to perform special tasks such as installation operation maintenance service and cleaning repair and transport Engineer The Engineer is the person who was appointed by the o...

Page 7: ...nger of physical injury exists if the tool is operated by not properly trained staff that are unable to perform the job according to the rules and regulations set The operating instructions and the in...

Page 8: ...have demonstrated the skills to operate the tool and who can be trusted to perform the assigned work in a reliable and professional manner The owner or lessee must provide operating and maintenance pe...

Page 9: ...ous situations may occur therefore it is obliged to carry out this work only by trained personnel 4 3 Safety tips during Operation The operating staff is required to check the working of brakes and em...

Page 10: ...g personnel should each write operation of the tool to convince the fact that the system is in the prescribed safe operating condition and proper operation When stopping the tool eg noted deficiencies...

Page 11: ...urned off as long as the tool is stationary for maintenance and repair It is mandatory to ensure environmentally sound disposal of replaced parts and harmful substances used during repair 4 5 Suggesti...

Page 12: ...n maintenance and repairs are carried out as described must be disabled first For all loading parts first check if they are stress free The electrical equipment of the tool should be regularly inspect...

Page 13: ...e loading a person can operate the tool and when the tool is lifted to the top by the crane the person on the first floor of the tool can operate when unloading To avoid simultaneous action commands t...

Page 14: ...s up indicating that the tool can be operated 5 4 Counter Weight The counter weight can be adjusted using the transmitter As a result the horizontal position of the I Boom is determined This is depend...

Page 15: ...ds are secured so that accidental fall over fall apart slide or roll is avoided Hand excited loads may only be moved if the person who has placed the load has been given a clear signal by the owner or...

Page 16: ...rams The electrical installation of the tool can only function properly within the specified ambient temperatures 6 2 Purpose of the electrical installation of the tool The displacement of the counter...

Page 17: ...so new operating personnel during shift rotation Control switches may only be operated from the control position The tool must not be mounted above a heat source 7 2 Switching on the Tool Check that t...

Page 18: ...of the tool the fans are used The pushbutton with the icon arrow turns the tool clockwise and the icon arrow turns the tool counter clockwise 7 6 Swivel The left and right turning is done by pressing...

Page 19: ...resumed by lifting the Stop switch 7 11 Load disconnecting When disconnecting the load the cables at all times must be stress free 7 12 End of day At the end of the day the battery voltage must be mo...

Page 20: ...he transmitters and tool by pressing the STOP switch Then the switch of the tool and the contra ballast wagon is disabled Place the tool in a secure environment on bobbins so that damage is prevented...

Page 21: ...from motors especially the hoist motor B Clean the outside of the control panels to ensure no heat transfer problems C Check the emergency stop for proper operation D Check the condition of all cables...

Page 22: ...ous bodily injury or property damage can occur when Unauthorized removal of hedging Improper use of the tool Misoperation Inadequate maintenance Exceeding the maximum allowable load Working on parts t...

Page 23: ...bstances it is regulated by rules and laws to responsibly and environmentally dispose of any waste Besides the local regulations and laws Liquid pollutants such as oil grease and toxic chemicals must...

Page 24: ...es in the operating instructions for the components are indicated as a base With the influence of the structural ratio as conduction of sound through steel the bouncing of sound through the walls of t...

Page 25: ...ent or which may not exceed the unit during installation From 01 01 1996 all in circulation or decommissioned plants to meet the EMC Directive are marked with the EC Conformity CE Mark Basis of the De...

Reviews: