8.13.3 Cleaning the water spraying system
Perform this maintenance work at
the latest after one year.
Protective equip-
ment:
n
Working clothes
n
Safety shoes
n
Protective gloves
1.
„Parking the machine in secured condi-
.
2.
Remove the cap (1).
3.
Take the filling screen (2) out and clean it.
4.
Check the filling screen for damage,
replace if necessary.
5.
Close the cap.
6.
Open the drain cover on the water tank and
let all water run out.
7.
Flush the water tank out with a strong
water jet.
8.
Drain off all water and dirt.
1
2
B-880-0189
Water
Fig. 162
B-880-0067
Fig. 163
Maintenance – As required
BW 100 AD-5
184
Summary of Contents for BW 100 AD-5
Page 2: ...2 ...
Page 9: ...1 Introduction Introduction BW 100 AD 5 9 ...
Page 13: ...2 Technical data Technical data BW 100 AD 5 13 ...
Page 19: ...3 Concerning your safety Concerning your safety BW 100 AD 5 19 ...
Page 64: ...Concerning your safety Signage BW 100 AD 5 64 ...
Page 65: ...4 Indicators and control elements Indicators and control elements BW 100 AD 5 65 ...
Page 81: ...5 Checks prior to start up Checks prior to start up BW 100 AD 5 81 ...
Page 96: ...Checks prior to start up Checking the hydraulic oil filter BW 100 AD 5 96 ...
Page 97: ...6 Operation Operation BW 100 AD 5 97 ...
Page 122: ...1 Plug Y04 Operation Emergency procedures BW 100 AD 5 122 ...
Page 123: ...7 Loading transporting the machine Loading transporting the machine BW 100 AD 5 123 ...
Page 134: ...Loading transporting the machine After transport BW 100 AD 5 134 ...
Page 135: ...8 Maintenance Maintenance BW 100 AD 5 135 ...
Page 188: ...Maintenance As required BW 100 AD 5 188 ...
Page 189: ...9 Setting up refitting Setting up refitting BW 100 AD 5 189 ...
Page 197: ...10 Troubleshooting Troubleshooting BW 100 AD 5 197 ...
Page 208: ...Troubleshooting Trouble shooting ECONOMIZER BW 100 AD 5 208 ...
Page 209: ...11 Disposal Disposal BW 100 AD 5 209 ...
Page 211: ......