Product Assembly - RFT - STEP 2c
22
S
TEP 2c:
Installation of the Front Uprights
(F730 & F738 Parts)
Attach the
Upright, Front, 78-1/2“, taller ones (4)
to the
Frame, Bottom Right - Assembly (3-ASM) and the Pulley
Connector Plate, Bottom, Right (212) using:
3/4 SOCKET &
6” EXTENSION
Recommended Tools
3/4 WRENCH
Please Hand Tighten All Bolts Until STEP 9
NOTE:
If you are installing the F737 Landmine Option
(600-ASM), change to the following hardware:
●
Two Bolts, Hex 1/2" x 4-1/2” (610)
●
Do not use both the shorter #257 bolts
●
Two BOLTS, Hex 1/2" x 4-1/4” (257)
●
Four WASHERS, Flat Large 1/2" (246)
●
Two NUTS, Hex Lock 1/2" (268)
Summary of Contents for F738
Page 11: ...Weight Stack Ratios RFT F738 11...
Page 63: ...Product Assembly RFT STEP 15 Weight Stack Stickers Installation 63...
Page 69: ...Product Assembly RFT Routine Schedule 69...
Page 70: ...Product Assembly RFT General Cable Inspection 70...
Page 71: ...Product Assembly RFT Lubrication Maintenance 71...
Page 72: ...Product Assembly RFT Strength Cable Wear Indicators 72...
Page 75: ...Detailed Parts Exploded View F738 1 of 2 75...
Page 76: ...Detailed Parts Exploded View F738 2 of 2 76...
Page 83: ...This page intentionally left blank...
Page 84: ......