![BodyCraft F738 Owner'S Manual Download Page 59](http://html1.mh-extra.com/html/bodycraft/f738/f738_owners-manual_2783200059.webp)
S
TEP 12a:
Cable Adjustment
Adjust cables to correct tension with less than 1/2” of play in
cables. Confirm the Cable End Bolt into the Cable Bolt Holder has
a MAX 1” of threads showing.
Product Assembly - RFT - STEP 12a
S
TEP 11d:
Repeat STEP 12a
- STEP 12c on Right Side of the
machine.
S
TEP 12b:
Confirm the Weight Stack Top Pulley (P8) is
screwed into the Top Plate with MAX 1” of the threads
showing. See image on right.
S
TEP 12c:
Confirm the Selector Rod Pin freely slides into each
weight plate front hole with the Top Plate (sticker 1) resting onto
1st Weight Plate (sticker 2).
NOTE:
Image shown below with
Weight Stack Stickers installed which will be during STEP 15.
59
Summary of Contents for F738
Page 11: ...Weight Stack Ratios RFT F738 11...
Page 63: ...Product Assembly RFT STEP 15 Weight Stack Stickers Installation 63...
Page 69: ...Product Assembly RFT Routine Schedule 69...
Page 70: ...Product Assembly RFT General Cable Inspection 70...
Page 71: ...Product Assembly RFT Lubrication Maintenance 71...
Page 72: ...Product Assembly RFT Strength Cable Wear Indicators 72...
Page 75: ...Detailed Parts Exploded View F738 1 of 2 75...
Page 76: ...Detailed Parts Exploded View F738 2 of 2 76...
Page 83: ...This page intentionally left blank...
Page 84: ......