Product Assembly - RFT - STEP 11b, 11c
Hardware assembly for each pulley:
●
One BOLT, Hex 3/8” x 2” (260)
●
Two WASHERS 3/8” (245)
●
One NUT, Nylon 3/8” (267)
S
TEP 11b - 11c:
Assembly of Bottom Cable (220) with Pulleys P13 - P16 (228) to the
Cable End Bolt Holder.
S
TEP 11b
S
TEP 11d:
Repeat STEP 11a thu STEP 11c
on Right Side of the machine using the 2nd
Bottom Cable (220).
S
TEP 11c
58
210
Summary of Contents for F738
Page 11: ...Weight Stack Ratios RFT F738 11...
Page 63: ...Product Assembly RFT STEP 15 Weight Stack Stickers Installation 63...
Page 69: ...Product Assembly RFT Routine Schedule 69...
Page 70: ...Product Assembly RFT General Cable Inspection 70...
Page 71: ...Product Assembly RFT Lubrication Maintenance 71...
Page 72: ...Product Assembly RFT Strength Cable Wear Indicators 72...
Page 75: ...Detailed Parts Exploded View F738 1 of 2 75...
Page 76: ...Detailed Parts Exploded View F738 2 of 2 76...
Page 83: ...This page intentionally left blank...
Page 84: ......