Form
No.
1540-69
r9/29/17 ©
2017
Bobrick
Washroom
Equipment,
Inc. Printed
in
U.S.A.
Page 4
Finished
Ceiling
Hex Nut
Split Lock Washer
Bevel Washer
Hex Nut
Structural
Beam
Spacer
Flat Shoe Retainer
Hex Nuts
Flat Washers
Split Lock Washer
Leveling Bar
Threaded Rod
Hex Nut
1'' Ref.
(25mm)
or as
Required
Floor
L-Bracket
#14 x 1-3/4"
(6.4 x 45mm)
St. Stl.
Sheet-Metal
Screw
#14-16
Plastic Anchor
Shoe
Retainer
Flat Washer
Hex Nut
Hex Nut
Flat Shoe Retainer
Wedge Anchor
2-1/8'' to 2-1/4''
(54 to 60mm)
1-5/8'' to 1-3/4''
(41 to 44mm)
Flat Washer
Leveling Bar
Install when
stile is placed
on anchor bolts.
Flat Washer
Hex Nut
Lock Washer
1'' Ref.
(25mm)
or as
Required
FLOOR ANCHORS. Standard & All .63 Options.
A. Drill 3/8" (9.5mm) diameter hole to 2" (50mm) minimum
depth. Remove all loose material from holes.
B. Insert expansion shield (threaded side down) with
threaded rod into mounting hole. Extra flat washers are
supplied. Place as many flat washers as necessary onto
rod to ensure shoe retainer is placed above finished floor
surface. Install and tighten a hex nut above washer(s) and
shoe retainer, tightening and expanding anchor to secure
to floor. Make sure when tightening bolt that shoe retainer
is positioned properly to accept shoe (see Fig. 2b or 10b
for proper shoe retainer position).
C. Add a second hex nut, then a flat washer.
D. Set aside the third hex nut, flat washer, and the lock
washer. Install when stile is placed on anchor bolts.
E. Repeat process for each floor anchor.
NOTE: Wood-floor anchors are available upon request.
CEILING ANCHORS. Standard & All .64 Options.
NOTE: Ceiling anchors are to be installed before finished
ceiling is applied. All structural framing is to be furnished by
others. For Bobrick recommendations, refer to Bobrick Form
No. TB-32.
A. Drill 7/16" (11mm) diameter hole through structural
beam. Insert threaded rod through hole in beam. Rod
is furnished standard 6" (150mm) length. Longer rods
should be purchased locally if required.
B. Drop a bevel washer and lock washer over rod. Screw on
one hex nut.
C. Install second hex nut against bottom of beam and
tighten.
D. Install spacer, shoe retainer, flat washer, and a third
hex nut. Make sure shoe retainer is in proper position to
accept shoe (see Fig. 2c or 10b for proper shoe retainer
position).
E. Install remaining flat washers (2), lock washer (1), and
hex nuts (2), as shown in Fig. 2b.
F. Repeat process for each ceiling anchor.
Fig. 2b: Detail of Floor Anchor.
Fig. 2c: Detail of Ceiling Anchor.
INSTALL ALL ANCHORS
STEP 2
OVERHEAD BRACED FLOOR ANCHORS.
A. Based on stile size locate centerline of floor L-brackets
from Drilling Table. (See page 3).
B. Drill 5/16" (8mm) diameter hole to 1-3/4" (45mm)
minimum depth. Remove all loose material from holes.
C. Install plastic anchors into holes.
D. Place one shoe retainer bracket at each hole location.
E. Place floor L-bracket on top of and inside each shoe
retainer.
F. Install #14 x 1-3/4" (M6.4 x 45mm) floor screws to retain
bottom floor L-brackets and shoe retainers. Do
NOT
tighten screws. Screws should be loose enough to adjust
the floor L-brackets.
G Using the stile as a measurement tool, adjust the floor
L-brackets to fit inside the stile brackets. Mark locations.
H. Remove stile and tighten floor screws securely.
Fig. 2a: Detail of Overhead Braced
Floor Anchor.
NOTE: Wood-floor anchors are available upon request. To
install drill 3/16" pilot hole in the floor and install using #14 x
1-3/4" (M6.3 x 45mm) screws.