9
t
ubing
i
nstallation
• Measure and cut the tubing to desired length. Leave enough slack in the tubing so the system can be easily removed, if
necessary. Cut the tubing square; remove all burrs and sharp edges.
• Insert tubing into fitting; push until it reaches the tube stop. Avoid kinking or stretching tubing. Check that tubing is secure;
gently pull on tubing, tubing should not pull free from fitting.
Figure 5 - Tubing Installation
t
ubing
r
emoVal
• If the system has been in use, shut off supply valve and drain the system before removing any tubing.
• Push in collar, squarely against the face of the fitting. Holding collar in position, pull tubing from the fitting.
Figure 6 - Tubing Removal
t
eChniCal
a
ssistanCe
Atlantic Ultraviolet Corporation maintains a qualified team of application specialists that can provide any technical assistance,
which maybe required during the use of this system. For any questions, concerns, or technical assistance, regarding this system or
any of our other products, contact our application specialists. Contact options can be found in the “
User Assistance
” section.
r
eCommended
o
Ptions
1.
Promate
TM
Safety Goggles:
Safety eyewear should be used as general-purpose safety protection and for additional shielding
from ultraviolet rays
2.
Promate
TM
Face Shield:
Adjustable headgear and lightweight visor provides eye and face protection from ultraviolet rays.
NOTE: The recommended options above are available from Atlantic Ultraviolet Corporation
®
or a distributor of their
products. For the other devices that may be required for your application, please contact your local water treatment
dealer, plumber or plumbing supplier.
Summary of Contents for PURE WATER PACK BIO 1.5 PWP
Page 19: ...19 MAINTENANCE NOTES...