background image

Measure the width of one of your rear Roof Panels (

RSS

). Place the Truss (

TRU

) on the sides

of the building and using your measurement from the rear to find where the rear Roof 

Panel (

RSS

) will rest upon the Truss (

TRU

) leaving room for the front Roof Panel (

RSS

) to rest 

on the Truss (

TRU

) also.  Fix the Truss (

TRU

) in place with 30mm nails (

N30

).

Tip: Although the roof sections are the same size there is an overhang at the front, so the truss will not be in the 

centre as you look internally.   

N30

 TRU

N30

 CP

Place the Centre Purlin (

CP

) on top of the Truss (

TRU

) and flush to the Plain and Door Gable

(

PG & DG

).

Fix the Eaves Purlin (

EP

) to the edge of the Roof Panels (

RSS

) using 30mm nails (

N30

) at 

intervals of approximately 300mm. On the front Roof Panels (

RSS

), which are the same as 

the rear ones, fix a Fascia Bolster Block (

FBB

) to the front edge of the Roof Panels (

RSS

) with 

30mm nails (

N30

).  This will allow the Fascia Boards (

FB

) to be fixed to the front of the Roof 

Panels (

RSS

).  

Tip: Use one of the purlins to draw a line along the board to help locate where the purlin will be 

when fixing them in place.  

N30

N30

 EP

 RSS

The opposing front

roof panels should 

look like this

N30

N30

 EP

 RSS

N30

N30

 FBB

Front Roof Panel

Rear Roof Panel

 DT

Use 50mm screws (

S50

) to fix the Door Threshold (

DT

) to the floor of the building 

between the two Window Panels (

WP

).  This may need cutting to fit. 

Tip: Pre-drill all holes before fixing.

S50

S50

 PG

 WP

S50

S50

S50

FLOOR

PLAIN GABLE

WINDOW P

ANEL

S50

As with the opposite side hold the second side Window Panel (

WP

) adjacent to the Plain 

Gable (

PG

) and fix them together with 50mm screws (

S50

).  Screw the panels together 

through the framing on the inside of the panels.

Tip: Pre-drill all holes before fixing.

Place the Door Gable (

DG

) between the two side walls and fix them together with 

50mm screws (

S50

). Fix the panels together through the framing of the panels. 

Tip: Pre-drill all holes before fixing.

 DG

 WP

S50

S50

S50

S50

S50

S50

 13

 14

 15

16

17

18

For Queries and Help please access our Support Centre: www.gardenbuildingsdirect.co.uk/help

Summary of Contents for INS-0072

Page 1: ...ions Please read the instructions carefully and please retain for future reference Please note that all images are for illustration purposes only For Queries and Help please contact Product Support 01...

Page 2: ...thinking of modifying this building be aware that any modifications invalidate your warranty and may affect your consumer rights We do not recomend fitting optional building parts such as a base from...

Page 3: ...with the fixing kit for safer transportation If they are still not found please visit our Support Centre www gardenbuildingsdirect co uk help Q What tools do I require A Drill with 4 5 3 and 2mm drill...

Page 4: ...TY x 2 FSS Floor SS or T G 1052 5mm x 1465mm EP Eaves Purlin R4C 28x28 0879 SQ QTY x 4 CP Centre Purlin R4C 28x28 1465 SQ QTY x 1 FI Final 14471 QTY x 2 FB Fascia Board 14468 QTY x 4 25877 QTY x 2 WP...

Page 5: ...ase 9ft Deep L2561 7 15734 Eze Base 7ft Gable L2105 2 15737 38mmx38mm Pressure Treated Spike 4 PT 01 11mm x 68mm Square Boards 13 SQ 01 PT 01 38mmx38mm Pressure Treated Spike QTY x 4 SQ 01 11mm x 68mm...

Page 6: ...ere to nd everything HANDY TIP Sort xings and wood kit by size and piece before starting Use a suitable drill bit for pilot hole 3mm is recommended for most 3mm or 4mm Avoid splitting wood by pre dril...

Page 7: ...ground on its shorter side Take one of the longer Side Joists 15734 This will be 2561mm and position it at a 90 degree angle to the first joist 15737 ensuring it fits against the side Drill a pilot h...

Page 8: ...r with 50mm screws S50 Repeat this process for the front Plain Gable Apex PG Tip Pre drillallholesbeforefixing PGL PGL PG PGR PGR S50 S50 S50 PP On the ground fix the rear Gable Apex PGL PGR to the Pl...

Page 9: ...ixed to the front of the Roof Panels RSS Tip Useoneofthepurlinstodrawalinealongtheboardtohelplocatewherethepurlinwillbe whenfixingtheminplace N30 N30 EP RSS The opposing front roof panels should look...

Page 10: ...sides and gables of the playhouse Make sure a nail penetrates the Centre Purlin CP at each end of the Roof Panel RSS Tip Usethisstagetosquareyourbuilding Door Gable N30 N30 N30 N30 Top View S50 S50 S...

Page 11: ...to outside of the door Metal Catch is fixed to the inside of the door S10 MC S25 MC 26 27 S30 DSB DSB DG DG Fix a Door Safety Block DSB to the Door Gable DG from the inside of the bulding using 30mm...

Page 12: ...Y x 2 21524 or 21523 34 21523 21524 level at side Front 21523 21524 or 21523 S50 S50 S50 S50 Front Picket Fence No Base Place the second length of decking next to the first ensuring there is a distanc...

Page 13: ...G WUXVV XVLQJ PP 6FUHZV 6 XW RXW WKH ODVW ERDUG WR XVK RQ HDYHV ZDOO S30 80mm Cut and lay the board L 1758mm aligned to the tip of the Gable Fix the board using 30mm Screws S30 See the image above S30...

Reviews: