For Queries and Help please call Product Support:
01909 768 858
Recommend
x2 for speed
1
2
3
4
8
5
9
6
7
10
Approximate building time is
4 to 6 Hours assembly
based on experience and size.
1. Cordless drill
2. Phillips bit
and drill bits
3. Hammer
4. Measuring Tape 10. Sand Paper
5. Pencil
6.Utility Knife
7. Woodsaw
8. Step ladder
9. Spirit level
What you need
Glazing,strips and fixings found in packs.
Woodkits - contains all strips,
framing, fixings and Instruction
for the building size.
Where to find everything
HANDY TIP: Sort fixings and wood kit by size and piece
before starting.
Use a suitable drill bit for pilot hole
- 3mm is recommended for most.
3mm or 4mm
Avoid spli
t
ting wood by pre-
drilling pi
lot holes for all screws
This is needed for all screw codes:
S12, S30,
S
40, S50, S70 and S100
IMPORTANT: Pre pilot drill
all screw holes
Pilot Drilling
Please note on the number of Floor and Roof
sections according to your building size.
Note:
Please see additional instruction for
T&G ROOFS (stages 35-38).
Building Size
Floor
Sections
Roof
Sections
Roof Boards
6 x 7 Max
6 x 7 Max
Platform
2
4
2
4
Roof Board Length = 1758 mm
Roof Board Length = 1758 mm
Floor / Roof Details
A
C
B
D