background image

19

20

21

22

23

24

A:

 Place the Glazing (

GL

) in to the window recess (NOT THE DOOR RECESS).

B

: Place the Window Cross (

WC

) pieces against the Glazing (

GL

).

C

: Use two 30mm screws (

S30

) per Glazing Block (

GB

) to hold the Glazing (

GL

) and 

Window Cross (

WC

) in to the window recess.

D

: The glazing in the Door (

D

) has no window cross and is held in place with 6 Glazing 

Blocks (

GB

)

S30 S30

S30

S30

S30

S30

22

 WC

 GL

 GB

 D

DOOR GLAZING

   HGD

  HGA

S25

S25

S25

(A)

(B)

(B)

Fascia Boards (

FB

) are attached to the front and rear of the Roof Panels (

RSS

) using 30mm 

nails (

N30

).  The Finials (

FI

) are fixed to the Fascia Boards (

FB

) with 30mm nails (

N30

). 

 

Tip: Make sure to trap the Felt behind the Fascia Boards. 

  

Tip: Pre-drill holes into Finials to help prevent splitting.

N30

N30

N30

  FB

   FI

N30

N30

N30

N30

  FB

  FB

  FI

 RSS

Place each Roof Panel (

RSS

) one at a time on to the building and use 30mm nails (

N30

approximately 300mm apart to fix the Roof Panels (

RSS

) to the sides and gables of the 

playhouse.  Make sure a nail penetrates the Centre Purlin (

CP

) at each end of the Roof 

Panel (

RSS

).

  

Tip: Use this stage to square your building.

Door Gable

N30

N30

N30

N30

Top View

S50

S50

S50

S50

Use 50mm screws (

S50

) to fix the walls of the building to the Floor (

FSS

). 

Tip: Pre-drill all holes before fixing.

A:

 Use 25mm black screws (

S25

) to fix two Hinges (

HGA

) to the  Door (

HGD

).  Use 25mm 

black screws to fix the glazing blocks (

GB

) to the door frame.  

B

: Fix the door flush against the square glazing blocks (

GB

) on the frame.  These blocks 

create a required safety gap around the door.  Once the door is fitted unscrew and 

remove all of the square blocks from the frame.

A

B

C

OVERLAP

EVENLY 

SPACED

100mm

FOLDED 

CORNERS

  T

  T

Front View

(3 PIECES OF FELT)

F

Lay the Felt (

F

) over the Roof Panels (

RSS

) in three strips and pin evenly along where the 

Felt (

F

) overlaps and along the Roof Panel (

RSS

) edges with Tacks (

T

) .  Trim all of the excess 

felt with a sharp knife. 

Tip: Overhang the felt over the front and back of the roof.

   T

  T

For Queries and Help please access our Support Centre: www.gardenbuildingsdirect.co.uk/help

Summary of Contents for INS-0072

Page 1: ...ions Please read the instructions carefully and please retain for future reference Please note that all images are for illustration purposes only For Queries and Help please contact Product Support 01...

Page 2: ...thinking of modifying this building be aware that any modifications invalidate your warranty and may affect your consumer rights We do not recomend fitting optional building parts such as a base from...

Page 3: ...with the fixing kit for safer transportation If they are still not found please visit our Support Centre www gardenbuildingsdirect co uk help Q What tools do I require A Drill with 4 5 3 and 2mm drill...

Page 4: ...TY x 2 FSS Floor SS or T G 1052 5mm x 1465mm EP Eaves Purlin R4C 28x28 0879 SQ QTY x 4 CP Centre Purlin R4C 28x28 1465 SQ QTY x 1 FI Final 14471 QTY x 2 FB Fascia Board 14468 QTY x 4 25877 QTY x 2 WP...

Page 5: ...ase 9ft Deep L2561 7 15734 Eze Base 7ft Gable L2105 2 15737 38mmx38mm Pressure Treated Spike 4 PT 01 11mm x 68mm Square Boards 13 SQ 01 PT 01 38mmx38mm Pressure Treated Spike QTY x 4 SQ 01 11mm x 68mm...

Page 6: ...ere to nd everything HANDY TIP Sort xings and wood kit by size and piece before starting Use a suitable drill bit for pilot hole 3mm is recommended for most 3mm or 4mm Avoid splitting wood by pre dril...

Page 7: ...ground on its shorter side Take one of the longer Side Joists 15734 This will be 2561mm and position it at a 90 degree angle to the first joist 15737 ensuring it fits against the side Drill a pilot h...

Page 8: ...r with 50mm screws S50 Repeat this process for the front Plain Gable Apex PG Tip Pre drillallholesbeforefixing PGL PGL PG PGR PGR S50 S50 S50 PP On the ground fix the rear Gable Apex PGL PGR to the Pl...

Page 9: ...ixed to the front of the Roof Panels RSS Tip Useoneofthepurlinstodrawalinealongtheboardtohelplocatewherethepurlinwillbe whenfixingtheminplace N30 N30 EP RSS The opposing front roof panels should look...

Page 10: ...sides and gables of the playhouse Make sure a nail penetrates the Centre Purlin CP at each end of the Roof Panel RSS Tip Usethisstagetosquareyourbuilding Door Gable N30 N30 N30 N30 Top View S50 S50 S...

Page 11: ...to outside of the door Metal Catch is fixed to the inside of the door S10 MC S25 MC 26 27 S30 DSB DSB DG DG Fix a Door Safety Block DSB to the Door Gable DG from the inside of the bulding using 30mm...

Page 12: ...Y x 2 21524 or 21523 34 21523 21524 level at side Front 21523 21524 or 21523 S50 S50 S50 S50 Front Picket Fence No Base Place the second length of decking next to the first ensuring there is a distanc...

Page 13: ...G WUXVV XVLQJ PP 6FUHZV 6 XW RXW WKH ODVW ERDUG WR XVK RQ HDYHV ZDOO S30 80mm Cut and lay the board L 1758mm aligned to the tip of the Gable Fix the board using 30mm Screws S30 See the image above S30...

Reviews: